List-based threshold-accepting algorithm for zero-wait scheduling of multiproduct batch plants

被引:23
作者
Lee, DS
Vassiliadis, VS
Park, JM
机构
[1] Univ Cambridge, Dept Chem Engn, Cambridge CB2 3RA, England
[2] POSTECH, Dept Chem Engn, Nam Gu, Pohang 790784, South Korea
关键词
D O I
10.1021/ie010570n
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A novel list-based threshold-accepting (LBTA) algorithm is proposed for solving the zero-wait (ZW) scheduling problem. The LBTA algorithm belongs to the class of threshold-accepting algorithms, but the acceptance probability decreases based on a list that is rejuvenated and adapted according to the topology of the solution space of the problem. A probabilistic steepest optimization strategy was adapted to search the solution space effectively. The effectiveness of the LBTA method is illustrated through case studies from scheduling literature which were formulated as mixed-integer linear programming and mixed-integer nonlinear programming models. The performance of the LBTA algorithm is also compared with that of the simulated annealing (SA) algorithm for a large number of various problem sizes. The proposed algorithm gives optimal solutions for small- to moderate-size ZW scheduling problems within a very short time and shows much superior computational performance compared to SA for large-size problems.
引用
收藏
页码:6579 / 6588
页数:10
相关论文
共 44 条
[41]   An Efficient Unit-Specific Event-Based Continuous-Time MILP Formulation for Short-Term Scheduling of Multistage and Multiproduct Batch Plants [J].
Li, Jie ;
Xiao, Xin ;
Floudas, Christodoulos A. .
22 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2012, 30 :772-776
[42]   Long-term scheduling of cleaning of heat exchanger networks -: Comparison of outer approximation-based solutions with a backtracking threshold accepting algorithm [J].
Smaïli, F ;
Vassiliadis, VS ;
Wilson, DI .
CHEMICAL ENGINEERING RESEARCH & DESIGN, 2002, 80 (A6) :561-578
[43]   A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel units [J].
He, Yaohua ;
Hui, Chi-Wai .
COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (12) :3067-3083
[44]   Rigorous Unit-Specific Event-Based Model for Short-Term Scheduling of Batch Plants Using Conditional Sequencing and Unit-Wait Times [J].
Vooradi, Ramsagar ;
Shaik, Munawar A. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2013, 52 (36) :12950-12972