Construction dewatering at Saluda Dam: Design, testing, and implementation

被引:0
|
作者
Osterle, JP [1 ]
Rizzo, PC [1 ]
Argentieri, W [1 ]
Holchin, JD [1 ]
机构
[1] Paul C Rizzo Assoc Inc, Monroeville, PA 15146 USA
来源
REDUCING RISK FROM EXTREME EVENTS | 2003年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The proposed Remediation of Saluda Darn, located approximately ten miles to the west of Columbia South Carolina and owned and operated by South Carolina Electric & Gas Company (SCE&G), consists of a 5,500-foot-long Rock Fill Berm and a 2,200-foot-long Roller Compacted Concrete (RCC) Berm. This combination RCC and Rockfill Berm will be constructed along the downstream toe of the existing 200-foot-high earth embankment dam. Should the existing Dam fail during a seismic event, the combination Rockfill and RCC Berm will serve as a backup dam to prevent an uncontrolled release of Lake Murray. Extensive foundation excavations into the residual soil or to bedrock at the toe of the existing Dam are required to facilitate the construction of the RCC and Rockfill Berm. To maintain an adequate factor of safety against slope instability for the existing Dam during construction, the existing phreatic surface within the Dam needs to be lowered substantially by dewatering. Based on the hydrogeologic conditions at the site, Paul C. Rizzo Associates (RIZZO) determined that the dewatering system should consist primarily of deep wells and eductors. Numerous components of this system that have been installed are currently operating to lower the phreatic surface within the Dam and downstream foundation excavation. Engineering analyses consisting of analytical models and finite element analyses were utilized to estimate the approximate spacing and flow rate required for the deep wells and eductors. Early indications are that the dewatering system will be successful in dewatering the existing Dam so that the construction can proceed without delay.
引用
收藏
页码:513 / 529
页数:17
相关论文
共 50 条
  • [1] Saluda Dam mix design program
    Rizzo, PC
    Osterle, JP
    Schrader, EK
    Gaekel, LR
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 177 - 186
  • [2] Saluda Dam remediation RCC mix design program
    Rizzo, PC
    Gaekel, LR
    Osterle, JP
    Moxley, SH
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 489 - 512
  • [3] Extensive shear testing for Saluda dam roller compacted concrete
    Schrader, EK
    Rizzo, PC
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 1045 - 1056
  • [4] Dewatering and injection testing for design and construction of the Fort Point Channel Crossing Project
    Bender, SF
    Buechel, GJ
    McHale, DP
    Druss, DL
    SPECIAL GEOTECHNICAL TESTING: CENTRAL ARTERY/TUNNEL PROJECT IN BOSTON, MASSACHUSETTS, 1999, (91): : 140 - 159
  • [5] Seismic evaluation of the semi-hydraulic fill Saluda Dam
    Bair, JM
    Rizzo, PC
    Fernandez, A
    Massey, KL
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 455 - 464
  • [6] Optimal Design and Dynamic Control of Construction Dewatering with the Consideration of Dewatering Process
    Shi, Cheng-hua
    Cao, Cheng-yong
    Lei, Ming-feng
    Peng, Li-min
    Jiang, Jing
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1161 - 1169
  • [7] Optimal design and dynamic control of construction dewatering with the consideration of dewatering process
    Cheng-hua Shi
    Cheng-yong Cao
    Ming-feng Lei
    Li-min Peng
    Jing Jiang
    KSCE Journal of Civil Engineering, 2017, 21 : 1161 - 1169
  • [8] Wyaralong Dam design and construction
    Deible, Jared
    Rizzo, Paul C.
    Herweynen, Richard
    Stratford, Colleen
    International Water Power and Dam Construction, 2010, 62 (08): : 16 - 19
  • [9] Overview of the Saluda Dam remediation project RCC and Rockfill dams
    Rizzo, PC
    Ammarell, R
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 465 - 488
  • [10] The testing, design, construction, and implementation of cemented rockfill (CRF) at Polaris
    Dismuke, S
    Diment, T
    CIM BULLETIN, 1996, 89 (1005): : 91 - 97