Value Stream Mapping and Simulation in a Construction Company

被引:0
|
作者
Tam, Yeen Shin [1 ]
Wong, Kuan Yew [1 ]
机构
[1] Univ Teknol Malaysia, Fac Mech Engn, Utm Skudai 81310, Johor, Malaysia
来源
INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015 | 2015年
关键词
Kanban; lean manufacturing; simulation; value stream mapping; Witness;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Lean manufacturing tools have been applied in a construction company in Malaysia. This project aims to identify the problems of the operations by using Value Stream Mapping and develop alternatives for improvement. Based on the current state value stream map, the Value Added (VA) ratio of the production is 0.43. The analysis shows that the most critical problem is the high queue time between QC inspection and primer coat painting due to unbalanced processes. Basic Kanban, CONWIP and Hybrid Kanban/CONWIP have been suggested and evaluated using the Witness simulation software. The simulation results indicate that Hybrid Kanban/CONWIP is the most suitable alternative. Based on the future state value stream map, the VA ratio has gained 11.63% to 0.48, indicating that Hybrid Kanban/CONWIP could effectively reduce the high queue time between QC inspection and primer coat painting.
引用
收藏
页码:297 / 308
页数:12
相关论文
共 50 条
  • [21] Waste identification diagram and value stream mapping A comparative analysis
    Dinis-Carvalho, Jose
    Guimaraes, Levi
    Sousa, Rui M.
    Leao, Celina Pinto
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2019, 10 (03) : 767 - 783
  • [22] Lean manufacturing analysis of a Heater industry based on value stream mapping and computer simulation
    Zahraee, Seyed Mojib
    Tolooie, Ali
    Abrishami, Salman Jameh
    Shiwakoti, Nirajan
    Stasinopoulos, Peter
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1379 - 1386
  • [23] LEAN MANUFACTURING IMPLEMENTATION IN A GEAR SHAFT MANUFACTURING COMPANY USING VALUE STREAM MAPPING
    Nallusamy, S.
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2016, 21 (21) : 231 - 237
  • [24] Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study
    Jeyaraj K.L.
    Muralidharan C.
    Mahalingam R.
    Deshmukh S.G.
    Journal of The Institution of Engineers (India): Series C, 2013, 94 (01) : 43 - 52
  • [25] IMPROVING PROCESS OF QUOTATION CREATION THROUGH VALUE STREAM MAPPING AND SIMULATION
    Sremcev, N.
    Stevanov, B.
    Lazarevic, M.
    Mandic, J.
    Tesic, Z.
    Kuzmanovic, B.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (04) : 563 - 573
  • [26] Cost Based Value Stream Mapping as a Sustainable Construction Tool for Undergraound Pipeline Construction Projects
    Gunduz, Murat
    Naser, Ayman Fahmi
    SUSTAINABILITY, 2017, 9 (12)
  • [27] VALUE STREAM MAPPING FOR EFFECTIVE LEAN MANUFACTURING
    Vujica Herzog, Natasa
    Polajnar, Andrej
    Kostanjevec, Tomaz
    ANNALS OF DAAAM FOR 2008 & PROCEEDINGS OF THE 19TH INTERNATIONAL DAAAM SYMPOSIUM, 2008, : 1515 - 1516
  • [28] Simulation-based value stream mapping: The formal modeling procedure
    Lian, YH
    Van Landeghem, H
    ECEC 2005: 12TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE 2005, 2005, : 79 - 84
  • [29] Value Stream Mapping with Simulation to Optimize Stock Levels: Case Study
    Midilli, Yunus Emre
    Elevli, Birol
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2020, 14 (03) : 295 - 302
  • [30] A value stream mapping and simulation hybrid approach: application to glass industry
    Atieh, Anas M.
    Kaylani, Hazem
    Almuhtady, Ahmad
    Al-Tamimi, Omar
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 84 (5-8) : 1573 - 1586