共 50 条
- [23] Planning production and working time within an annualised hours scheme framework Annals of Operations Research, 2007, 155 : 5 - 23
- [25] Systematic and Effective Maintenance Capacity Planning 2020 INDUSTRIAL & SYSTEMS ENGINEERING CONFERENCE (ISEC), 2020,
- [28] Planning Production Capacity Optimisation with Rough Cut Capacity Planning PERTANIKA JOURNAL OF SOCIAL SCIENCE AND HUMANITIES, 2016, 24 : 33 - 45
- [29] Capacity planning method for semiconductor fab with time constraints between operations 2006 SICE-ICASE INTERNATIONAL JOINT CONFERENCE, VOLS 1-13, 2006, : 5462 - +
- [30] Multiobjective Cloud Capacity Planning for Time-Varying Customer Demand 2014 11TH ANNUAL HIGH CAPACITY OPTICAL NETWORKS AND EMERGING/ENABLING TECHNOLOGIES (PHOTONICS FOR ENERGY), 2014, : 84 - 88