Managing risks in mega defense acquisition projects: Performance, policy, and opportunities

被引:41
作者
Kwak, Young Hoon [1 ]
Smith, Brian M. [2 ]
机构
[1] George Washington Univ, Sch Business, Dept Decis Sci, Washington, DC 20052 USA
[2] USN, Ft Belvoir, VA 22060 USA
关键词
Project management; Risk management; Department of Defense; Cost estimating; Future Combat Systems; Case study; IMPLEMENTING STRATEGY; MANAGEMENT;
D O I
10.1016/j.ijproman.2009.02.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research explores key aspects involved in the process of managing risk associated with acquisition projects within the US Department of Defense (DOD). First, various US Government Accountability Office reports are analyzed to identify the strengths and weaknesses of the DOD's overall program management practices, as well as individual projects. Then, the evolution and progress of United States Army's Future Combat Systems project is examined in detail as a case study to substantiate the argument that insufficient risk management has contributed to project delays and cost overruns significantly. Poor risk management performance and practices are not unique to the Army, but arises from a system bred into the process of gaining approval to implement projects in the DOD. Incorporating a comprehensive risk management plan in the planning phase and filling key project management positions with personnel trained to recognize sound proposals from contractors would make significant strides toward improving overall project management practices in the DOD. (C) 2009 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:812 / 820
页数:9
相关论文
共 47 条
  • [1] Baccarini D., 2001, INT J PROJ MANAG, V19, P139, DOI DOI 10.1016/S0263-7863(99)00074-5
  • [2] Baldry D., 1998, International journal of Project Management, V16, P35
  • [3] Barber R. B., 2005, International Journal of Project Management, V23, P584, DOI 10.1016/j.ijproman.2005.05.006
  • [4] Bhuiyan Nadia., 1999, International Journal of Project Management, V17, P121
  • [5] Brazil vows to install condom machines in schools, 2007, WASHINGTON POST 0207
  • [6] Taking control of follicular dendritic cells
    Chaplin, DD
    Zindl, CL
    [J]. IMMUNITY, 2006, 24 (01) : 13 - 15
  • [7] Chapman C., 2004, International Journal of Project Management, V22, P619, DOI 10.1016/j.ijproman.2004.05.001
  • [8] Chapman C.B., 1997, INT J PROJ MANAG, V15, P273, DOI [DOI 10.1016/S0263-7863(96)00079-8, 10.1016/S0263-7863(96)00079-8]
  • [9] *DEP DEF INSTR, 2002, 50002R DEP DEF INSTR
  • [10] Department of Defense, 2002, INT DEF ACQ GUID