Optimizing Resource Leveling in Construction Projects

被引:77
作者
El-Rayes, Khaled [1 ]
Jun, Dho Heon [1 ]
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2009年 / 135卷 / 11期
基金
美国国家科学基金会;
关键词
GENETIC ALGORITHMS; MODEL; OPTIMIZATION;
D O I
10.1061/(ASCE)CO.1943-7862.0000097
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction schedules, generated by network scheduling techniques, often cause undesirable resource fluctuations that are impractical, inefficient, and costly to implement on construction sites. This paper presents the development of two innovative resource leveling metrics to directly measure and minimize the negative impact of resource fluctuations on construction productivity and cost. The first metric quantifies the total amount of resources that need to be temporarily released during low demand periods and rehired at a later stage during high demand periods. The second measures the total number of idle and nonproductive resource days that are caused by undesirable resource fluctuations. The two new metrics are incorporated in a robust and practical optimization model that is capable of generating optimal and practical schedules that maximize the efficiency of resource utilization. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities. The results of this analysis show that the present model and metrics are capable of outperforming existing metrics and eliminating undesirable resource fluctuations and resource idle time.
引用
收藏
页码:1172 / 1180
页数:9
相关论文
共 18 条
[1]  
Ahuja H.N., 1976, Construction Performance Control by Networks
[2]   Resource smoothing: a cost minimization approach [J].
Akpan, EOP .
PRODUCTION PLANNING & CONTROL, 2000, 11 (08) :775-780
[3]   OPTIMAL RESOURCE LEVELING USING NON-SERIAL DYNAMIC-PROGRAMMING [J].
BANDELLONI, M ;
TUCCI, M ;
RINALDI, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) :162-177
[4]  
Burgess A.R., 1962, J IND ENGINEERING, V13, P76
[5]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[6]   Scheduling with co-evolving resource availability profiles [J].
Chua, DKH ;
Chan, WT ;
Kannan, G .
CIVIL ENGINEERING SYSTEMS, 1996, 13 (04) :311-329
[7]  
DEB K, 2001, 200001 KANGAL IND I
[8]   RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION [J].
EASA, SM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02) :302-316
[9]  
Goldberg D. E., 1989, Genetic Algorithms in Search, Optimization and Machine Learning
[10]  
Harris R.B., 1978, Precedence and Arrow Networking Techniques for Construction