Modeling Road Construction Project Cost in the Philippines Using the Artificial Neural Network Approach

被引:0
作者
Roxas, Cheryl Lyne C. [1 ]
Roxas, Nicanor R., Jr. [2 ]
Cristobal, Jerald [1 ]
Hao, Sara Eunice [1 ]
Rabino, Rochelle Marie [1 ]
Revalde, Fulgencio, Jr. [1 ]
机构
[1] De La Salle Univ, Civil Engn Dept, Taft Ave Malate, Manila, Philippines
[2] De La Salle Univ, Mfg Engn & Management Dept, Taft Ave Malate, Manila, Philippines
来源
2019 IEEE 11TH INTERNATIONAL CONFERENCE ON HUMANOID, NANOTECHNOLOGY, INFORMATION TECHNOLOGY, COMMUNICATION AND CONTROL, ENVIRONMENT, AND MANAGEMENT (HNICEM) | 2019年
关键词
REGRESSION-ANALYSIS; MULTIPLE-REGRESSION;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especially during the conceptualization stage. When stakeholders need an immediate estimate of the budget for a project, in-depth cost analysis may take time, sacrificing resources for feasibility studies. In the Philippines, a more effective and efficient early cost estimation method is recommended to ensure proper utilization of government funds. In this paper, the artificial neural network technique was adopted to model the local total road project cost. Data collection included 41 road projects with each having 15 factors were recorded, namely: road type, location (region), length of road, duration of project, capacity, pavement thickness, pavement width, shoulder width, earthworks volume, average site clearing/grubbing area, presence of water body, soil conditions, surface class, gross domestic product and consumer price index. After correlation analysis, 7 input variables were finalized. These are the soil condition, surface class, gross domestic product, presence of water body, pavement width, road type and capacity. Several simulations were performed in MATLAB software to determine the best total road project cost model. The best neural network architecture consists of 7 input variables, 12 neurons in the hidden layer and 1 output variable. This neural network model satisfactorily predicted the total cost with coefficient of correlation values of 0.97168, 0.95188, and 0.99036 for training, validation and testing phases, respectively.
引用
收藏
页数:5
相关论文
共 50 条
[31]   Composition Prediction of a Debutanizer Column using Equation Based Artificial Neural Network Model [J].
Ramli, Nasser Mohamed ;
Hussain, M. A. ;
Jan, Badrul Mohamed ;
Abdullah, Bawadi .
NEUROCOMPUTING, 2014, 131 :59-76
[32]   Predicting properties of single jersey fabrics using regression and artificial neural network models [J].
Unal, Pelin Gurkan ;
Ureyen, Mustafa Erdem ;
Mecit, Diren .
FIBERS AND POLYMERS, 2012, 13 (01) :87-95
[33]   Investigation of using regression analysis and artificial neural network methods in estimate of solar radiation [J].
Deniz, Emrah ;
Atik, Kemal .
ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2007, 27 (02) :15-20
[34]   Quarter Circular Breakwater: Prediction of Transmission Using Multiple Regression and Artificial Neural Network [J].
Goyal, Rushil ;
Singh, Kriti ;
Hegde, Arkal Vittal .
MARINE TECHNOLOGY SOCIETY JOURNAL, 2014, 48 (01) :92-98
[35]   Prediction of surface roughness in milling with a ball end tool using an artificial neural network [J].
Gimadeev, Mikhail ;
Stelmakov, Vadim ;
Nikitenko, Aleksandr ;
Uliskov, Maksim .
OBRABOTKA METALLOV-METAL WORKING AND MATERIAL SCIENCE, 2025, 27 (02) :126-141
[36]   Predicting properties of single jersey fabrics using regression and artificial neural network models [J].
Pelin Gurkan Unal ;
Mustafa Erdem Üreyen ;
Diren Mecit .
Fibers and Polymers, 2012, 13 :87-95
[37]   Objective Hand Evaluation of Stretch Fabrics Using Artificial Neural Network and Computational Model [J].
Ahirwar, Meenakshi ;
Behera, B. K. .
JOURNAL OF NATURAL FIBERS, 2022, 19 (16) :13640-13652
[38]   Cleaning performance forecast modeling of sugarcane harvester using BP neural network [J].
Ma, FL ;
He, YL ;
Li, SP ;
Liang, S ;
Chen, WX .
System Simulation and Scientific Computing, Vols 1 and 2, Proceedings, 2005, :1542-1547
[39]   Predicting entry speed of traffic-calmed roads: Regression versus artificial neural network approach [J].
Rahman M. ;
Shafie I.K. .
Advances in Transportation Studies, 2023, 59 :247-268
[40]   Modeling of creep compliance behavior in asphalt mixes using multiple regression and artificial neural networks [J].
Alrashydah, Esra'a I. ;
Abo-Qudais, Saad A. .
CONSTRUCTION AND BUILDING MATERIALS, 2018, 159 :635-641