A parallel-machine scheduling problem with two competing agents

被引:19
作者
Lee, Wen-Chiung [1 ]
Chung, Yu-Hsiang [1 ]
Wang, Jen-Ya [2 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung, Taiwan
[2] Hungkuang Univ, Dept Comp Sci & Informat Management, Taichung, Taiwan
关键词
Scheduling; total completion time; two-agent problem; parallel-machine problem; maximum tardiness; TOTAL COMPLETION-TIME; OPTIMIZATION PROBLEMS; GENETIC ALGORITHMS; MAXIMUM TARDINESS; RELEASE TIMES; MINIMIZE; EARLINESS; PENALTIES; SUBJECT; MODEL;
D O I
10.1080/0305215X.2016.1227615
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling with two competing agents has become popular in recent years. Most of the research has focused on single-machine problems. This article considers a parallel-machine problem, the objective of which is to minimize the total completion time of jobs from the first agent given that the maximum tardiness of jobs from the second agent cannot exceed an upper bound. The NP-hardness of this problem is also examined. A genetic algorithm equipped with local search is proposed to search for the near-optimal solution. Computational experiments are conducted to evaluate the proposed genetic algorithm.
引用
收藏
页码:962 / 975
页数:14
相关论文
共 40 条
[1]   An adaptive parameter binary-real coded genetic algorithm for constraint optimization problems: Performance analysis and estimation of optimal control parameters [J].
Abdul-Rahman, Omar Arif ;
Munetomo, Masaharu ;
Akama, Kiyoshi .
INFORMATION SCIENCES, 2013, 233 :54-86
[2]   Scheduling problems with two competing agents [J].
Agnetis, A ;
Mirchandani, PB ;
Pacciarelli, D ;
Pacifici, A .
OPERATIONS RESEARCH, 2004, 52 (02) :229-242
[3]   New approximation algorithms for flow shop total completion time problem [J].
Bai, Danyu ;
Ren, Tao .
ENGINEERING OPTIMIZATION, 2013, 45 (09) :1091-1105
[4]   A multiple-criterion model for machine scheduling [J].
Baker, KR ;
Smith, JC .
JOURNAL OF SCHEDULING, 2003, 6 (01) :7-16
[5]   Parallel Robot Scheduling to Minimize Mean Tardiness with Unequal Release Date and Precedence Constraints Using a Hybrid Intelligent System Regular Paper [J].
Cakar, Tarik ;
Koker, Rasit ;
Sari, Yavuz .
INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2012, 9
[6]  
Chawdhry P.K., 1997, Soft Computing in Engineering Design and Manufacturing, V1st
[7]   Minimizing the total completion time on a parallel machine system with tool changes [J].
Costa, A. ;
Cappadonna, F. A. ;
Fichera, S. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 :290-301
[8]   A discrete gravitational search algorithm for solving combinatorial optimization problems [J].
Dowlatshahi, Mohammad Bagher ;
Nezamabadi-Pour, Hossein ;
Mashinchi, Mashaallah .
INFORMATION SCIENCES, 2014, 258 :94-107
[9]   Stochastic cell loading to minimize nT subject to maximum acceptable probability of tardiness [J].
Egilmez, Goekhan ;
Sueer, Guersel A. .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 :136-143
[10]   Efficient non-population-based algorithms for the permutation flowshop scheduling problem with makespan minimisation subject to a maximum tardiness [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
COMPUTERS & OPERATIONS RESEARCH, 2015, 64 :86-96