LARGE EMBANKMENT NEAR SUHAREKE ON THE KOSOVO MOTORWAY

被引:0
|
作者
Gjetvaj, Verica [1 ]
Buselic, Ljerka [1 ]
机构
[1] Inst IGH, Zagreb, Croatia
关键词
motorway; embankment; construction; consolidation; settlement;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Exploratory works in cuttings of Prizren - Suhareke section (Section 3) of Morine-Merdare Motorway showed that the properties of material do not fulfill the required criteria without additional treatment, and that deep excavations in such materials will cause slope instabilities. For this reason the adopted vertical route alignment resulted in grade line elevation with the highest embankment height 19 m. Faced with short construction deadlines a stone material em ban km ent was designed with the intention to complete settling during construction works. A part of the consolidation settlement of the foundation soil was solved by replacement of material, while the consequences of the remaining settlement which will take place over a longer time period, will be treated within the motorway maintenance. The problem arose when the contractor faced a shortage of stone material during construction and with already completed structures on the subject motorway part. A solution for the embankment construction had to enable the embankment trunk or embankment body to settle during construction, at the same time keeping the already designed embankment geometry and the slopes resistant to the loo year floods. The embankment was designed and constructed with a combination of materials selected from cuts on the route (materials categories B and c) which were placed in layers with load bearing polycarbonate grids placed in between. Finishing parts of every layer on the slope are made of stone material.
引用
收藏
页码:781 / 787
页数:7
相关论文
共 50 条
  • [21] PASSIVE BIOMONITORING OF INFLUENCE OF THE COMMUNICATION TRAFFIC ON DEPOSITION THE POLLUTION NEAR THE MOTORWAY
    Swislowski, Pawel
    Banach, Eryk
    Rajfur, Malgorzata
    ECOLOGICAL CHEMISTRY AND ENGINEERING A-CHEMIA I INZYNIERIA EKOLOGICZNA A, 2019, 26 (1-2): : 113 - 125
  • [22] Crossing of the Isle and Dordogne Valleys by the A89 motorway near Libourne
    Demmerle, D
    Sauvaget, P
    Giroussens, M
    Riondy, G
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2004, (04): : 52 - 58
  • [23] Piled foundations for the M25 Motorway near Heathrow Airport
    Pennington, Mark
    Spence, John
    ADVANCES IN TRANSPORTATION GEOTECHNICS, 2008, : 453 - 457
  • [24] Semi-integral viaducts for the new A 11 motorway near Bruges
    Schlaich, Mike
    Wenger, Philipp
    Behrmann, Tilo
    Burkhardt, Uwe
    BAUTECHNIK, 2017, 94 (07) : 445 - 448
  • [25] Bi-tan motorway arch bridge near Taipei, Taiwan
    Lin, T.Y.
    Industria Italiana del Cemento, 1999, 69 (02):
  • [26] The Engelberg base tunnel near Leonberg/Baden-Wurttemberg, a large cross-section motorway tunnel in difficult ground conditions
    Dietz, W
    Lorscheider, W
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 795 - 800
  • [27] Natural resources of Kosovo and Metohija - Present state and near future
    Karamata, Stevan
    Zivotic, Dragana
    Jelenkovic, Rade
    Bursac, Milan
    Kosovo and Methija: Past, Present , Future, 2006, : 365 - 380
  • [28] EMBANKMENT FAILURE ON CLAY NEAR RIO DE JANEIRO - DISCUSSION
    ALMEIDA, MSS
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1985, 111 (02): : 253 - 256
  • [29] EMBANKMENT FAILURE ON CLAY NEAR RIO DE JANEIRO - CLOSURE
    RAMALHOORTIGAO, JA
    WERNECK, MLG
    LACERDA, WA
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1985, 111 (02): : 262 - 264
  • [30] EMBANKMENT FAILURE ON CLAY NEAR RIO-DE-JANEIRO
    RAMALHOORTIGAO, JA
    WERNECK, MLG
    LACERDA, WA
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1983, 109 (11): : 1460 - 1479