EXPLORATION OF A MULTI-PRODUCT EPQ-BASED SYSTEM WITH OVERTIME AND QUALITY REASSURANCE

被引:0
|
作者
Chiu, Singa Wang [1 ]
Chou, Chung-Li [1 ]
Lin, Hong-Dar [2 ]
Hwang, Ming-Hon [3 ]
机构
[1] Chaoyang Univ Technol, Dept Business Adm, Taichung, Taiwan
[2] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung, Taiwan
[3] Chaoyang Univ Technol, Dept Mkt & Logist Management, Taichung, Taiwan
关键词
Operations research; Production planning; Overtime; Rework; Failure in rework; Scrap; MULTISTAGE PRODUCTION; REWORK; MULTIITEM; DEMAND; SIZE;
D O I
10.24818/18423264/53.3.19.05
中图分类号
F [经济];
学科分类号
02 ;
摘要
In contemporary global marketplaces, buyers demand has to be satisfied with the timely provision of multiple products. Further; in real manufacturing settings, fabrication of imperfect items is inevitable owing to unanticipated issues; these items must be identified, separated, reworked or scrapped to keep product quality at the desired level. To cope with all these issues, producers must be able to make a flexible manufacturing plan that not only meets buyers' multi product needs on time with perfect quality goods, but also has smooth fabrication schedules. Overtime is an effective alternative for increasing output rate and reducing completion time in batch production. Seeking to assist in production planning, this study explores a multi product economic production quantity-based system with overtime and product quality reassurance, with the objective of finding the optimal stock refilling policy that minimizes total system cost. Mathematical techniques are employed to develop a precise model to represent the problem, find the total system cost, and determine a closed-form optimal common cycle length. A numerical illustration is provided to demonstrate that our model can reveal: (i) the influence of the variation in overtime-related factors on the system's variable cost, utilization, and total cost; (ii) the impact of difference in factors related to product quality on total system cost; and (iii) the combined impacts of changes in overtime and quality-related factors on various system parameters. Our investigation provides insights on system-related information that supports the planning and controlling functions of a realistic system.
引用
收藏
页码:77 / 94
页数:18
相关论文
共 38 条
  • [21] Optimization of a Multi-Product Intra-Supply Chain System with Failure in Rework
    Chiu, Singa Wang
    Chen, Shin-Wei
    Chang, Chih-Kai
    Chiu, Yuan-Shyi Peter
    PLOS ONE, 2016, 11 (12):
  • [22] AN INTEGRATED PRODUCTION AND DELAY-TIME BASED PREVENTIVE MAINTENANCE PLANNING MODEL FOR A MULTI-PRODUCT PRODUCTION SYSTEM
    Liu, Xuejuan
    Wang, Wenbin
    Peng, Rui
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (02): : 215 - 221
  • [23] An economic production quantity inventory model for multi-product imperfect production system with setup time/cost function
    Nobil, Amir Hossein
    Niaki, Seyed Taghi Akhavan
    Niaki, Seyed Armin Akhavan
    Cardenas-Barron, Leopoldo Eduardo
    REVISTA DE LA REAL ACADEMIA DE CIENCIAS EXACTAS FISICAS Y NATURALES SERIE A-MATEMATICAS, 2022, 116 (01)
  • [24] Modelling And optimal lot-sizing of the replenishments in constrained, multi-product and bi-objective EPQ models with defective products: Generalised Cross Decomposition
    Gharaei, Abolfazl
    Hoseini Shekarabi, Seyed Ashkan
    Karimi, Mostafa
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 262 - 274
  • [25] Minimum average-cost production plan in a multi-product stochastic manufacturing system
    Sethi, SP
    Suo, W
    Taksar, MI
    Yan, H
    ETFA '96 - 1996 IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, PROCEEDINGS, VOLS 1 AND 2, 1996, : 361 - 365
  • [26] Simulation based model for component replenishment in multi-product ATO systems with shared resources
    Shami, Azeem
    Sinha, Ashesh Kumar
    INTERNATIONAL JOURNAL OF MODELLING AND SIMULATION, 2023, 43 (06) : 864 - 878
  • [27] An integrated production and procurement design for a multi-period multi-product manufacturing system with machine assignment and warehouse constraint
    Vaziri, Shaghayegh
    Zaretalab, Arash
    Esmaeili, Mohammad
    Niaki, S. T. A.
    APPLIED SOFT COMPUTING, 2018, 70 : 238 - 262
  • [28] Estimating the Clearing Function for a Multi-Product Production Network Based on Mean-Value Analysis
    Omar, Rayan Saleem M.
    Venkatadri, Uday
    Diallo, Claver
    IFAC PAPERSONLINE, 2016, 49 (12): : 1755 - 1760
  • [29] Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction
    Diaby, Moustapha
    Cruz, Jose M.
    Nsakanda, Aaron L.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 228 (03) : 526 - 535
  • [30] Optimal Production Planning in a Multi-Product Stochastic Manufacturing System with Long-Run Average Cost
    S.P. Sethi
    W. Suo
    M.I. Taksar
    H. Yan
    Discrete Event Dynamic Systems, 1998, 8 : 37 - 54