Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction

被引:17
作者
Wang, Jing-chun [1 ]
Liu, Jia-qi [1 ]
Wei, Qiang [2 ]
Wang, Peng [2 ]
机构
[1] Shijiazhuang TieDao Univ STDU, Coll Civil Engn, 17 Northeast,Second Inner Ring, Shijiazhuang, Hebei, Peoples R China
[2] China Railway Construct Management Co Ltd, Beijing, Peoples R China
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2021年 / 28卷 / 01期
基金
中国国家自然科学基金;
关键词
cloud model; combination weight; risk assessment; tunnel construction;
D O I
10.17559/TV-20200917163330
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to reduce the tunnel construction accidents and ensure the safety of personnel, a comprehensive assessment method of tunnel construction risk based on combination weighting and cloud model is constructed according to the characteristics of tunnel construction. The risk assessment index system is established based on researches on engineering geological condition, natural environmental condition, Tunnel engineering design scheme and construction management. On this basis, the tunnel risk is divided into 4 levels and the index risk level standard is proposed. In order to improve the rationality of weighting, a weight calculation method based on AHP, entropy method and Lagrange multiplier method is constructed. Finally, the normal cloud generator is used to form comparison pictures of risk clouds and standard clouds, which demonstrates the risk status of the evaluation indexes at all levels. With reference to Deda Tunnel of Sichuan-Tibet Railway engineering of high integrated risk level, management decision-making is required. The evaluation results are basically consistent with engineering practices, proving that the method has good feasibility and applicability.
引用
收藏
页码:203 / 210
页数:8
相关论文
共 26 条
  • [1] Use of fragility curves to assess the seismic vulnerability in the risk analysis of mountain tunnels
    Andreotti, G.
    Lai, C. G.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 91
  • [2] Treatment of uncertainty in risk assessments in the Rogfast road tunnel project
    Bjelland, Henrik
    Aven, Terje
    [J]. SAFETY SCIENCE, 2013, 55 : 34 - 44
  • [3] Reflections on Bayesian Network models for road tunnel safety design: A case study from Norway
    Borg, Audun
    Bjelland, Henrik
    Nja, Ove
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 43 : 300 - 314
  • [4] Evaluation of risk assessment procedures for buildings adjacent to tunnelling works
    Clarke, Julie A.
    Laefer, Debra F.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 333 - 342
  • [5] Risk and risk analysis in rock engineering
    Einstein, HH
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (02) : 141 - 155
  • [6] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rezai, Bahram
    Rostami, Jamal
    Bejari, Hadi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 69 (04) : 523 - 532
  • [7] Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels
    Hyun, Ki-Chang
    Min, Sangyoon
    Choi, Hangseok
    Park, Jeongjun
    Lee, In-Mo
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 121 - 129
  • [8] Risk modelling with Bayesian Networks - case study: construction of tunnel under the Dead Vistula River in Gdansk
    Kemblowski, Marian W.
    Grzyl, Beata
    Kristowski, Adam
    Siemaszko, Agata
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 585 - 591
  • [9] On the application of near accident data to risk analysis of major accidents
    Khakzad, Nima
    Khan, Faisal
    Paltrinieri, Nicola
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 126 : 116 - 125
  • [10] Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects
    Li, Jie
    Zou, Patrick X. W.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1205 - 1209