Influence of system operation on the design and performance of a direct ground-coupled cooling system

被引:12
作者
Arghand, Taha [1 ]
Javed, Saqib [1 ]
Truschel, Anders [1 ]
Dalenback, Jan-Olof [1 ]
机构
[1] Chalmers Univ Technol, Div Bldg Serv Engn, Dept Architecture & Civil Engn, S-41296 Gothenburg, Sweden
关键词
Direct ground cooling; Borehole heat exchanger; Peak shaving; Active chilled beam; Borehole sizing; Borehole fluid temperature;
D O I
10.1016/j.enbuild.2020.110709
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sizing of borehole heat exchangers (BHEs) for direct ground cooling systems (DGCSs) is a critical part of the overall system design. This study investigates the thermal performance and sizing of a DGCS with two different operation strategies using experimental and simulation approaches. The traditional on/off operation strategy keeps a constant room temperature. The continuous operation strategy has the potential to reduce the building peak cooling loads by precooling the space and having a variable room temperature measures. The experimental results from the laboratory-scale setup show the differences in the hourly room heat extraction rates and the room temperature pattern for the operation strategies applied. The experimental data is also used to develop a simulation model. The simulation results show that applying the continuous strategy reduces the building peak cooling loads and lowers the heat injection rates to the ground. For new BHEs, applying the continuous strategy can result in shorter BHEs, owing to the significantly lower ground heat injection rates. For existing BHEs, applying the continuous strategy can decrease the borehole outlet fluid temperature and thus, increase the cooling capacity of the building cooling system. The findings of this study have implications for developing the widespread use of DGCSs. (C) 2020 The Author(s). Published by Elsevier B.V.
引用
收藏
页数:12
相关论文
共 47 条
[1]  
[Anonymous], 7730 ISO
[2]  
[Anonymous], 2007, 15251 EN
[3]  
[Anonymous], 2004, Standard 55, Thermal Comfort Conditions for Human Occupancy
[4]   Cooling of office buildings in cold climates using direct ground-coupled active chilled beams [J].
Arghand, Taha ;
Javed, Saqib ;
Truschel, Anders ;
Dalenback, Jan-Olof .
RENEWABLE ENERGY, 2021, 164 :122-132
[5]   Control methods for a direct-ground cooling system: An experimental study on office cooling with ground-coupled ceiling cooling panels [J].
Arghand, Taha ;
Javed, Saqib ;
Truschel, Anders ;
Dalenback, Jan-Olof .
ENERGY AND BUILDINGS, 2019, 197 :47-56
[6]  
ASHRAE, 2017, ASHRAE HDB HVAC FUND
[7]  
ASHRAE, 2017, ASHRAE HDB FUND
[8]   Model predictive HVAC load control in buildings using real-time electricity pricing [J].
Avci, Mesut ;
Erkoc, Murat ;
Rahmani, Amir ;
Asfour, Shihab .
ENERGY AND BUILDINGS, 2013, 60 :199-209
[9]   Effects of the geothermal load on the ground temperature recovery in a ground heat exchanger [J].
Baek, Seung Hyo ;
Yeo, Myoung Souk ;
Kim, Kwang Woo .
ENERGY AND BUILDINGS, 2017, 136 :63-72
[10]   Optimal Real-Time Residential Thermal Energy Management for Peak-Load Shifting With Experimental Verification [J].
Baniasadi, Ali ;
Habibi, Daryoush ;
Bass, Octavian ;
Masoum, Mohammad A. S. .
IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (05) :5587-5599