The problem of fuzzy scheduling

被引:0
作者
Dolgov, AI [1 ]
机构
[1] Rostov Mil Inst Rocket Def, Rostov On Don 344027, Russia
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of scheduling fuzzily described tasks is one that is typically encountered in the field of organizational control, Such tasks are characterized by their start and end dates and by the independently specified length of times for direct execution of each task The solution of these: types of problems reduces to construction of a continuous distribution of tasks on execution intervals that do not overlap the construction intervals of other tasks, a discrete-continuous distribution of tasks on overlapping execution intervals, and a discrete distribution of intervals with preliminarily distributed tasks over the entire schedule period.
引用
收藏
页码:1 / 7
页数:7
相关论文
共 5 条
  • [1] *ART INT, 1991, APPL INT PROD SYST
  • [2] FEIGIN LI, 1983, DOKL AKAD NAUK SSSR+, V272, P812
  • [3] NARINYANI AS, 1997, INFORMATSIONNYE TEKH, P22
  • [4] Tanaev V. S., 1989, THEORY SCHEDULES MUL
  • [5] TANAEV VS, 1984, THEORY SCHEDULES SIN