Proposed guidelines for treatment of recurrent failures for sustainability of results in the post-project improvement stage process

被引:3
作者
Almeida, Caio Melo [1 ]
Araujo, Fernando Oliveira [1 ]
Abreu, Chrystyane Gerth Silveira [2 ]
Batista, Haydee Maria Correia da Silveira [1 ]
机构
[1] Fluminense Fed Univ, Niteroi, RJ, Brazil
[2] Fed Ctr Technol Educ Rio de Janeiro, Nova Iguacu, Brazil
关键词
Process improvement; Continuous improvement; Results maintenance; Sustainability of results; CRITICAL SUCCESS FACTORS; 6; SIGMA; HUMAN-RESOURCE; IMPLEMENTATION; KAIZEN; PERFORMANCE; METHODOLOGY; MANAGEMENT; FRAMEWORK; PROGRAMS;
D O I
10.1108/BIJ-06-2020-0277
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The maintenance of process improvement programs within organizations is not an easy task. Some processes do not maintain the results achieved with the improvement project and again present low performance shortly after completion of the project. This paper aims to identify the socio-technical causes responsible for the loss of process performance after applying improvement projects, in order to support the mitigation of the problem. Design/methodology/approach A systematic review of the literature was carried out, which allowed the selection of 28 articles. The empirical stage used the benchmarking technique, along a large Brazilian mining company with an international standard of production and quality. This organization has been using improvement projects for more than ten years. Findings The research complements the literature regarding the prioritization of the 26 identified failures and the identification of seven new failure factors and two resources. Findings in this study can be an inspiration for other organizations, considering the similarity of methodological aspects of improvement projects since internationally standardized methodologies such as Six Sigma, Lean, Kaizen and 5S are used. Originality/value The research presented a proposal of guidelines that corroborate to the mitigation of loss of process performance after improvement project.
引用
收藏
页码:2496 / 2520
页数:25
相关论文
共 59 条
  • [1] [Anonymous], 2000, BENCHMARKING INT J
  • [2] [Anonymous], 2015, Estatistica aplicada a administracao e economia
  • [3] Benchmarking Six Sigma implementation in services companies operating in an emerging economy
    Augusto Cauchick Miguel, Paulo
    Monteiro de Carvalho, Marly
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2014, 21 (01) : 62 - 76
  • [4] Sustainability: the elusive element of process improvement
    Bateman, N
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2005, 25 (3-4) : 261 - 276
  • [5] Bateman N, 2003, INT J OPER PROD MAN, V23, P185, DOI [10.1108/01443570310458477, 10.1108/01443570310458447]
  • [6] Process improvement programmes: a model for assessing sustainability
    Bateman, N
    David, A
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2002, 22 (5-6) : 515 - 526
  • [7] Lean manufacturing: literature review and research issues
    Bhamu, Jaiprakash
    Sangwan, Kuldip Singh
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2014, 34 (07) : 876 - 940
  • [8] The impact of human resource and operational management practices on company productivity: A longitudinal study
    Birdi, Kamal
    Clegg, Chris
    Patterson, Malcolm
    Robinson, Andrew
    Stride, Chris B.
    Wall, Toby D.
    Wood, Stephen J.
    [J]. PERSONNEL PSYCHOLOGY, 2008, 61 (03) : 467 - 501
  • [9] Successful lean implementation: Organizational culture and soft lean practices
    Bortolotti, Thomas
    Boscari, Stefania
    Danese, Pamela
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 160 : 182 - 201
  • [10] The effects of lean organizational practices on employees' attitudes and workers' health: evidence from France
    Bouville, Gregor
    Alis, David
    [J]. INTERNATIONAL JOURNAL OF HUMAN RESOURCE MANAGEMENT, 2014, 25 (21) : 3016 - 3037