Geodetic Accuracy in Observational Construction of an Excavation Stabilized by Top-Down Method: A Case Study

被引:4
作者
Ghorbani, E. [1 ]
Khodaparast, M. [1 ]
机构
[1] Univ Qom, Fac Engn, Dept Civil Engn, Qom, Iran
关键词
Total station; Top-Down excavation; Observational construction; Monitoring accuracy; Geodetic study; Numerical model; GROUND MOVEMENTS; WALL; PERFORMANCE; SYSTEM;
D O I
10.1007/s10706-019-00936-8
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Traffic disorder and excavation hazards due to substructure construction are of the foremost challenges in great cities. Deep excavation causes stress changes in adjacent soil mass near the excavated site which induces ground deformations. Magnitude of this deformation depends on many factors including excavation geometry, ground conditions, supporting system, construction quality, time interval of execution, and construction delays. Field monitoring utilizing appropriate instruments allows conductor to predict the ground deformation trends and is useful in risk management and improvement of construction stages. It is important to measure the accuracy of the selected monitoring tool in the field precisely. In this study, accuracy of monitoring tool and observational construction of a deep excavation in an overcrowded street are discussed. In observational construction method, construction sequences are monitored and the obtained data are analyzed frequently, so construction stages or designed elements of the structure can be modified to increase safety or to enhance the economy of the project. In this article, ground deformation trends in an excavation supported by Top-Down method in the city of Qom, in Iran is surveyed by means of Total Station TS02 and the precision of the gathered information is evaluated using statistical analysis and numerical model. On this basis modifications are applied and construction stages of southern side of the excavated area are reconsidered to cease the increasing failure in this side.
引用
收藏
页码:4759 / 4775
页数:17
相关论文
共 33 条
[21]   Database for retaining wall and ground movements due to deep excavations [J].
Long, M .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (03) :203-224
[22]   Analysis of tunnel displacement accuracy with total station [J].
Luo, Yanbin ;
Chen, Jianxun ;
Xi, Weizheng ;
Zhao, Pengyu ;
Qiao, Xiong ;
Deng, Xianghui ;
Liu, Qin .
MEASUREMENT, 2016, 83 :29-37
[23]   Analysis of wall and ground movements due to deep excavations in soft soil based on a new worldwide database [J].
Moormann, C .
SOILS AND FOUNDATIONS, 2004, 44 (01) :87-98
[24]   Performance of diaphragm wall constructed using top-down method [J].
Ou, CY ;
Liao, JT ;
Lin, HD .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1998, 124 (09) :798-808
[25]   Innovative building construction technique: Modified up/down method [J].
Paek, JH ;
Ock, JH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :141-146
[26]  
Paydar Gostar Soil Mechanics Co, 2013, 10529 PAYD GOST SOIL
[27]  
Peck R.B., 1969, P 7 INT C SOIL MECH, P225, DOI DOI 10.1201/B12748-79
[28]  
Sahel Consultant Co, 2011, ENG SERV QOM SUBW PR
[29]   Wall and Ground Movements due to Deep Excavations in Shanghai Soft Soils [J].
Wang, J. H. ;
Xu, Z. H. ;
Wang, W. D. .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2010, 136 (07) :985-994
[30]  
Wang JH, 2006, GEOSH INT C, P385, DOI [10.1061/40867(199)48, DOI 10.1061/40867(199)48]