Operating room scheduling problem under uncertainty: Application of continuous phase-type distributions

被引:18
作者
Varmazyar, Mohsen [1 ]
Akhavan-Tabatabaei, Raha [2 ]
Salmasi, Nasser [3 ]
Modarres, Mohammad [1 ]
机构
[1] Shairf Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Sabanci Univ, Sch Management, Istanbul, Turkey
[3] Corning Inc, Wilmington, NC 28405 USA
关键词
Operating theater room scheduling; Post-Anesthesia Care Unit (PACU); minimization of makespan; continuous phase-type distributions; heuristics and meta-heuristic algorithms; HEURISTIC ALGORITHM; M-MACHINE; N-JOB; OPTIMIZATION; SIMULATION; TIMES; PREDICTION; BEDS;
D O I
10.1080/24725854.2019.1628372
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article studies the stochastic Operating Room (OR) scheduling problem integrated with a Post-Anesthesia Care Unit (PACU), the overall problem is called the Operating Theater Room (OTR) problem. Due to the inherent uncertainty in surgery duration and its consecutive PACU time, the completion time of a patient should be modeled as the sum of a number of random variables. Some researchers have proposed the use of the normal distribution for its well-known additive property, but there are questions regarding its fitting adequacy to real OTR data, which tends to be asymmetric with a long tail. We propose to estimate the surgery and PACU times with the family of Continuous PHase-type (CPH) distributions, which provides both fitting adequacy and additive property. We first compute the completion time of each patient analytically and compare the results with normal and lognormal distributions on a series of real OTR datasets. Then, we develop a search algorithm embedding a constructive heuristic and a meta-heuristic algorithm as a sequence generator engine for the patients, and apply the CPH distribution as a chance constraint to eventually find the schedule of each sequence in the OTR problem. The best algorithm among several tested constructive heuristic algorithms is used as the neighborhood structure of meta-heuristic algorithms. We finally construct a numerical example of OTR problem to illustrate the application of the proposed algorithm.
引用
收藏
页码:216 / 235
页数:20
相关论文
共 59 条
[1]  
Abdelrasol ZakariaY., 2013, Proceedings of the world congress on engineering and computer science, V2, P23
[2]  
Abe Tolu K., 2016, IIE Transactions on Healthcare Systems Engineering, V6, P175, DOI 10.1080/19488300.2016.1199613
[3]  
[Anonymous], ARXIV160504574
[4]  
[Anonymous], THESIS
[5]  
[Anonymous], WORKING PAPER
[6]  
[Anonymous], MATLAB REL 2014A
[7]  
[Anonymous], SAS RELEASE 9 1
[8]  
[Anonymous], RECENT TRENDS IN INF
[9]   MAXIMIZING THE UTILIZATION OF OPERATING ROOMS WITH STOCHASTIC TIMES USING SIMULATION [J].
Arnaout, Jean-Paul M. ;
Kulbashian, Sevag .
2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, :1617-1623
[10]   SIMULATION OPTIMISATION FOR OPERATING ROOM SCHEDULING [J].
Baesler, F. ;
Gatica, J. ;
Correa, R. .
INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2015, 14 (02) :215-226