Building Information Modeling in tunneling - digital design and construction of tunneling projects

被引:1
|
作者
Konig, Markus [1 ]
Rahm, Tobias [2 ]
Nagel, Felix [3 ]
Speier, Ludger [2 ]
机构
[1] Ruhr Univ Bochum, Lehrstuhl Informat Bauwesen, Univ Str 150, D-44780 Bochum, Germany
[2] ZPP Ingenieure AG, Lise Meitner Allee 11, D-44801 Bochum, Germany
[3] ZPP Ingenieure AG, Ackerstr 3b, D-10115 Berlin, Germany
关键词
building information modeling; tunneling; digital structure models; information system;
D O I
10.1002/bate.201700005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The application of Building Information Modeling (BIM) in the field of infrastructure engineering is to be introduced and subsequently established in Germany by 2020. This includes the planning, production and operation of tunnel structures. In research and real projects, experiences concerning the application of the BIM methodology were collected over the last couple of years. As it turned out, the holistic introduction of BIM requires a detailed analysis of processes and project specific definition of reasonable use cases. Within the scope of this paper, current experiences and BIM use cases in the field of tunneling are discussed. The definition of a reasonable geometric and semantical level of detail for the specific use cases is exemplified. Following that, the implementation of a shared data interface, as well as the correlation and exchange of subject-specific models are described. Hereby, approaches based on linked data or multi model containers have proven to be especially suitable. Based on practical examples, several use cases and the associated project goals for the application of BIM are discussed.
引用
收藏
页码:227 / 231
页数:5
相关论文
共 50 条
  • [1] Building Information Modeling in the execution phase of conventional tunneling projects
    Huymajer, Marco
    Melnyk, Oleksandr
    Wenighofer, Robert
    Huemer, Christian
    Galler, Robert
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 146
  • [2] Building Information Modeling in the execution phase of conventional tunneling projects
    Huymajer, Marco
    Melnyk, Oleksandr
    Wenighofer, Robert
    Huemer, Christian
    Galler, Robert
    Tunnelling and Underground Space Technology, 2024, 146
  • [3] Generating a digital twin for tunneling projects during the construction phase
    Hegemann, F.
    Stascheit, J.
    Maidl, U.
    Gangrade, R.
    Kottke, P.
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2701 - 2709
  • [4] Digital construction with Building Information Modeling - the digital twin
    Oettinghaus, Sven
    WASSERWIRTSCHAFT, 2019, 109 (05) : 86 - 89
  • [5] The Role of Building Information Modeling in Offsite Construction Projects
    Meng, Xianhai
    Li, Yongjuan
    Meng, Junyu
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2022, 13 (01)
  • [6] Overview of Building Information Modeling Applications in Construction Projects
    Aboushady, A. M.
    Elbarkouky, M. M. G.
    AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 445 - 456
  • [7] A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects
    Ding, Zhikun
    Liu, Shan
    Liao, Longhui
    Zhang, Liang
    AUTOMATION IN CONSTRUCTION, 2019, 102 : 45 - 58
  • [8] The Tunneling Information Management System – A tool for documenting the tunneling process in NATM projects
    Huymajer M.
    Operta D.
    Mazak-Huemer A.
    Huemer C.
    Geomechanik und Tunnelbau, 2022, 15 (03): : 259 - 264
  • [9] Practices improvement of building information modeling in the Egyptian construction projects
    Nabil, Yasmin
    Ibrahim, Ahmed H.
    Hosny, Suad
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [10] Building Deformation Caused by Tunneling: Centrifuge Modeling
    Ritter, Stefan
    Giardina, Giorgia
    Franza, Andrea
    DeJong, Matthew J.
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2020, 146 (05)