Categorization of Saudi Arabia's construction delay factors using factor analysis technique

被引:0
|
作者
Rahman, I. A. [1 ]
Al-Emad, N. [1 ]
Nagapan, S. [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil & Environm Engn, Parit Raja Batu Pahat, Johor, Malaysia
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents categorization of 37 delay factors of Saudi Arabia construction industry. The factors were identified from literature review and verified by construction experts through questionnaire survey involved 100 respondents using 5-points Likert's scale. Collected data from the survey were used to categories the factors into groups using factor analysis function in SPSS software. Nine principal components were generated based on factors loading and these components are meant as groups for the factors. Generated results were evaluated to ensure that factors are assigned to an appropriate group. Evaluation involved relocation of factors to ensure that the factors are logically placed in their respective group. The evaluation resulted in 7 groups only where the groups were given names related to the nature of factors in them. Results from categorization can be used for advance analysis such as structural equation modelling which required groups as latent variables.
引用
收藏
页码:177 / 181
页数:5
相关论文
共 50 条
  • [1] Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
    Gopang, Raja Khan Mohammed
    Imran, Qadir Bux alias
    Nagapan, Sasitharan
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 225 - 233
  • [2] Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia
    Alhajri, Abdullah Rasheed
    Alshibani, Adel
    ENERGIES, 2018, 11 (07):
  • [3] Factors influencing safety performance in the construction industry of Saudi Arabia: an exploratory factor analysis
    Mosly, Ibrahim
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (02) : 901 - 908
  • [4] Multivariate Analysis of Factors Influencing Construction Costs in Saudi Arabia
    Mosly, Ibrahim
    BUILDINGS, 2025, 15 (05)
  • [5] Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach
    Rahman, Ismail Abdul
    Al-Emad, Nashwan
    Nagapan, Sasitharan
    2016 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2016), 2016, 81
  • [6] BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia's Construction
    Alnaser, Aljawharah A.
    Alsanabani, Naif M.
    Al-Gahtani, Khalid S.
    BUILDINGS, 2023, 13 (09)
  • [7] Estimating total factor productivity in the Saudi Arabia construction sector
    Alzyadat, Jumah Ahmad
    Alotaibi, Abdulrahman Fahad
    Almubdel, Abdulaziz Hamad
    Alrshaid, Nasser Abdullah
    AMAZONIA INVESTIGA, 2021, 10 (40): : 45 - 53
  • [8] Analysis of the Current Situation of the Construction Industry in Saudi Arabia and the Factors Affecting It: An Empirical Study
    Yu, Haian
    Shang, Zufeng
    Wang, Fenglai
    SUSTAINABILITY, 2024, 16 (16)
  • [9] AHP-DEMATEL modelling of consultant related delay factors affecting sustainable housing construction in Saudi Arabia
    Sodangi, Mahmoud
    Salman, Alaa
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (16) : 2859 - 2868
  • [10] Financial Analysis for Replacement of Construction Equipment in Saudi Arabia
    Shash, Ali A.
    CONSTRUCTION ECONOMICS AND BUILDING, 2005, 5 (01): : 16 - 22