Linking time-lapse digital photography and dynamic scheduling of construction operations

被引:15
作者
Abeid, J [1 ]
Arditi, D
机构
[1] Univ Western Ontario, Fac Engn Sci, Dept Civil & Environm Engn, London, ON N6A 5B9, Canada
[2] IIT, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
关键词
scheduling; construction management; digital techniques; imaging techniques; photography;
D O I
10.1061/(ASCE)0887-3801(2002)16:4(269)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A dynamic scheduling system that links digital movies of construction activities, a CPM schedule, and progress control of construction has been developed. A time-lapse technique has been used in such a way that months of construction performance can be watched in minutes. A method to produce a digital movie has been developed allowing thousands of pictures to be stored in, and managed by, microcomputers under a Windows environment. A recording system has been introduced enabling the user to specify the day-by-day progress achieved in activities undertaken, allowing the program to link the playback movie with the progress observed on the construction field. A CPM engine has been developed to produce a Gantt chart. A procedure to build a histogram of expected cumulative percentage of progress is presented. An animation engine has been built in order to generate new bars reflecting the progress reported on the bar chart and the histogram, working in synchrony with the playback movie.
引用
收藏
页码:269 / 279
页数:11
相关论文
共 10 条
[1]  
*AGC, 1994, CONSTR PLANN SCHED
[2]  
Cantu M., 1998, MASTERING DELPHI, V4
[3]  
CONQUAS 21, 1998, BUILDING CONSTRUCTIO
[4]   Internet video monitoring of ice-boom performance [J].
Crissman, RD ;
Lalumiere, LA .
JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1998, 124 (05) :451-455
[5]  
CURTIN DP, 1998, SHORT COURSE DIGITAL
[6]   Time-lapse video applications for construction project management [J].
Everett, JG ;
Halkali, H ;
Schlaff, TG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (03) :204-209
[7]  
Popescu C. M., 1995, Project planning, scheduling, and control in construction: An encyclopedia of terms and applications
[8]  
RUBIN RA, 1983, COSNTRUCTION CLAIMS
[9]   HSM-SIMULATION-BASED PLANNING METHOD FOR CONSTRUCTION PROJECTS [J].
SAWHNEY, A ;
ABOURIZK, SM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03) :297-303
[10]   Simplified simulation system for construction projects [J].
Senior, BA ;
Halpin, DW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01) :72-81