A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [41] An earned value model with risk analysis for project management under uncertain conditions
    Moradi, Navid
    Mousavi, S. Meysam
    Vandani, Behnam
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (01) : 97 - 113
  • [42] PROJECT RISK MANAGEMENT
    Bran, Florina
    Hincu, Daniela
    Radulescu, Carmen Valentina
    METALURGIA INTERNATIONAL, 2009, 14 : 102 - 105
  • [43] A Risk Analysis Study: Model Development for Risk Mitigation and Systematic Approach to FTI System Design Activities
    Ozseven, Osman Birkan
    Tambova, Safak
    Helvaci, Halil
    2022 IEEE INTERNATIONAL SYMPOSIUM ON SYSTEMS ENGINEERING (ISSE), 2022,
  • [44] Construction cost analysis under uncertainty with correlated cost risk analysis model
    Oekmen, Oeder
    Oeztas, Ahmet
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (02) : 203 - 212
  • [45] Construction Project Delay Risk Assessment Based on 4M1E Framework and Afghanistan Situation
    Sharifzada, Hijratullah
    Deming, Yu
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2024, 10 (01): : 100 - 116
  • [46] Systemic Risk Analysis of Safety, Progress, and Investment in the Construction of a Water Transfer Project and the Importance of Common Cause Failure
    He, Shan
    Wang, Hui
    Zhang, Jiaming
    Fan, Jiayi
    Zheng, Yunlong
    Xu, Jijun
    Cheng, Weishuai
    Yang, Mingzhi
    Shen, Chenzhu
    WATER, 2024, 16 (10)
  • [47] Risk assessment in construction
    Jannadi, OA
    Almishari, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (05): : 492 - 500
  • [48] Managing project scope creep in construction industry
    Ajmal, Mian M.
    Khan, Mehmood
    Gunasekaran, Angappa
    Helo, Petri T.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2786 - 2809
  • [49] TRANSPORT PROJECT EVALUATION: FEASIBILITY RISK ASSESSMENT AND SCENARIO FORECASTING
    Salling, Kim Bang
    Leleur, Steen
    TRANSPORT, 2017, 32 (02) : 180 - 191
  • [50] Exhaustive control of a construction project in contaminated soil
    Travesa, F
    Colomer, V
    Rius, J
    Mundo, B
    CONTAMINATED SOIL '98, VOLS 1 AND 2, 1998, : 1221 - 1222