A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [31] Investment Risk Analysis of Gas and Pipeline Construction Project Based on the Gray Analytic Hierarchy Process
    Mu, Lin-lin
    Bi, Xing
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 467 - 471
  • [32] Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
    Alani, Semaa Hazim Najim
    Mahjoob, Ahmed Mohammed Raoof
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2021, 11 (03) : 7223 - 7227
  • [33] Risk Analysis of Affordable Housing Project Based on PPP Financing Model
    Cheng, Xiaoye
    Cai, Wenwen
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 508 - 512
  • [34] A model to reduce the risk of project selection utilizing data envelopment analysis
    Sadeghiyan, Shaghayegh
    Lotfi, Farhad Hosseinzadeh
    Daneshian, Behrouz
    Shotobani, Nima Azarmir
    JOURNAL OF MODELLING IN MANAGEMENT, 2022, 17 (01) : 341 - 362
  • [35] An analytic network process model for risk quantification of mega construction projects
    Erol, Huseyin
    Dikmen, Irem
    Atasoy, Guzide
    Birgonul, M. Talat
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 191
  • [36] Risk analysis in construction networks using a modified stochastic assignment model
    Guo, QL
    Maher, M
    Wamuziri, S
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2001, 18 (03) : 215 - 241
  • [37] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Ji Hyun Jung
    Dae Young Kim
    Hak Ki Lee
    KSCE Journal of Civil Engineering, 2016, 20 : 1119 - 1130
  • [38] Evaluating risk of water mains failure using a Bayesian belief network model
    Kabir, Golam
    Tesfamariam, Solomon
    Francisque, Alex
    Sadiq, Rehan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 220 - 234
  • [39] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Jung, Ji Hyun
    Kim, Dae Young
    Lee, Hak Ki
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1119 - 1130
  • [40] A fuzzy group assessment model for evaluating the rate of aggregative risk in software development
    Lee, Huey-Ming
    Lee, Tsung-Yen
    Lee, Shu-Yen
    Chen, Jan-Jo
    International Journal of Reliability, Quality and Safety Engineering, 2004, 11 (01) : 17 - 33