A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [21] The Project Risk Analysis Model based on Neural Network
    Dong Fugui
    Li Ning
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7440 - 7442
  • [22] Study on Risk Analysis and Risk Evaluation Model of Mountainous Highway Construction
    Liu, Jikun
    Liu, Enyu
    Guo, Hongjuan
    Wang, Cuixia
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 291 - 298
  • [23] Analysis of risk factors affecting the main execution activities of roadways construction projects
    Issa U.H.
    Marouf K.G.
    Faheem H.
    Journal of King Saud University - Engineering Sciences, 2023, 35 (06) : 372 - 383
  • [24] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [25] The analytic model and its application of generalized project risk analysis
    Li, CB
    Fan, LH
    Guo, Y
    Li, Z
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 229 - 231
  • [26] Engineering Project Risk Interpretation Structure Model Building and Analysis
    Zhang, Rui
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2640 - 2644
  • [27] Applying Importance Measures to Risk Analysis in Engineering Project Using a Risk Network Model
    Fang, Chao
    Marle, Franck
    Xie, Min
    IEEE SYSTEMS JOURNAL, 2017, 11 (03): : 1548 - 1556
  • [28] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (01) : 25 - 36
  • [29] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    JOURNAL OF PROJECT MANAGEMENT, 2022, : 25 - 36
  • [30] A Model for Risk Assessment and Management of Construction Projects in Urban Conditions
    Siemaszko, Agata
    Kristowski, Adam
    Grzyl, Beata
    2018 BALTIC GEODETIC CONGRESS (BGC-GEOMATICS 2018), 2018, : 7 - 11