A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [1] Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model
    Nasir, D
    McCabe, B
    Hartono, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (05): : 518 - 527
  • [2] A Fuzzy-based Risk Model for Construction Project Management
    Chaher, Zid
    Benseghir, Hocine
    Ibrahim, Abdullah
    Kabir, Muhammad Nomani
    2018 IEEE CONFERENCE ON SYSTEMS, PROCESS AND CONTROL (ICSPC), 2018, : 129 - 134
  • [3] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2011 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION AND INDUSTRIAL APPLICATION (ICIA2011), VOL II, 2011, : 212 - 215
  • [4] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL VII, 2010, : 213 - 216
  • [5] Risk analysis in construction phase of subway project
    Jia Jungang
    Zhuang Weimin
    Xu Lei
    PROCEEDINGS OF 20TH IPMA WORLD CONGRESS ON PROJECT MANAGEMENT, VOLS 1 AND 2, 2006, : 123 - 127
  • [6] Delay Analysis Selection Model for a Construction Project
    Yang, Juneseok
    Arditi, David
    Lee, Dong-Eun
    Mutis, Ivan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (12) : 4926 - 4941
  • [7] A comparison of risk analysis techniques in construction project management
    McCowan, A
    Mohamed, S
    INNOVATIVE DEVELOPMENTS IN ARCHITECTURE, ENGINEERING AND CONTRUCTION, 2003, : 401 - 410
  • [8] A risk management model for project execution
    ALHawari, Sarner
    Thabtah, Fadi
    Karadsheh, Louay
    Hadi, Wa'el Musa
    INFORMATION MANAGEMENT IN THE MODERN ORGANIZATIONS: TRENDS & SOLUTIONS, VOLS 1 AND 2, 2008, : 887 - 893
  • [9] Can ChatGPT exceed humans in construction project risk management?
    Nyqvist, Roope
    Peltokorpi, Antti
    Seppanen, Olli
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (13) : 223 - 243
  • [10] Developing a fuzzy synthetic evaluation model for risk assessment: a case of Addis-Djibouti railway construction project
    Gashaw, Tesfaye
    Jilcha, Kassu
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (02)