A modified method for the prediction of Monte Carlo simulation based on the similarity of random field instances

被引:4
|
作者
Li, Lielie [1 ]
Liu, Zhiyong [2 ,3 ]
Jin, Junwei [4 ]
Xue, Jianfeng [2 ]
机构
[1] North China Univ Water Resources & Elect Power, Sch Civil Engn & Commun, Zhengzhou, Henan, Peoples R China
[2] Univ New South Wales, Sch Engn & Informat Technol, Campbell, ACT, Australia
[3] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Peoples R China
[4] Zhengzhou Univ, Sch Civil Engn, Zhengzhou, Peoples R China
关键词
Probabilistic methods; Monte Carlo simulation; Similarity condition; Random field; FINITE-ELEMENT-METHOD; SPATIAL VARIABILITY; RISK-ASSESSMENT; STABILITY ANALYSIS; WAVE-PROPAGATION; BEARING-CAPACITY; SOIL PROPERTIES; SLOPE FAILURE; CONVERGENCE; TUNNEL;
D O I
10.1007/s40948-021-00238-5
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Monte Carlo simulation method is a powerful tool to consider inherent variability of soil properties in geotechnical problems. However, to fully reveal the variability and obtain convergent results, a large number of Monte Carlo simulations are required, which need great computational power and time, especially for complicated geotechnical problems with multiple random variables. In this paper, to reduce the number of Monte Carlo simulations and ensure the accuracy of the outcomes, an existing procedure is modified using a small part of Monte Carlo instances (GK) to predict the remaining part of instances (GP) based on similarity. Both the Frobenius norm (||D||(F)) of the difference matrix D between a matrix P (from GP) and a matrix K (from GK), and the relative difference (RD) of the mean values and standard deviations of P and K are considered to compare the similarity of the two matrices P and K. A qualified instance from GK having minimum RD and acceptable ||D||(F) is selected to predict the outcome of the instance P. The modified procedure contains two main steps: to obtain the critical ||D||(F), and to predict the outcomes of individual instances using the results of instances qualified with ||D||(F) less than the critical ||D||(F). The performance of the modified procedure is compared with that of the existing method and full Monte Carlo simulation using two examples: the settlement of a shallow foundation and the convergence of a tunnel. The comparison indicates that the modified procedure performs better than the existing method, and the predicted outcomes are comparable with those obtained from full Monte Carlo simulations. According to parametric study, at least 60 samples are required in the modified method to get a comparable result with a full Monte Carlo simulation.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] A simple Monte Carlo simulation method for geotechnical reliability-based design
    Li, Bin
    Zhang, Lianyu
    Yuan, Jinquan
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2024, 18 (03) : 558 - 569
  • [42] Reconstruction-based Monte Carlo method for accurate and efficient breakage simulation
    Chen, Yongjie
    Ding, Jue
    Xia, Xi
    Weng, Peifen
    POWDER TECHNOLOGY, 2022, 401
  • [43] Simulation and quantitative analysis of fluorescence intensity distribution based on the Monte Carlo method
    Zhou, Kun
    Tian, Jian
    Zhang, Qiushi
    Meng, Xiangxi
    Yang, Kun
    Ren, Qiushi
    JOURNAL OF INNOVATIVE OPTICAL HEALTH SCIENCES, 2015, 8 (06)
  • [44] Biospecific properties of random copolymers, 1 -: Monte Carlo simulation of the radical random terpolymerization
    Bouzou, B
    Pflüger, F
    MACROMOLECULAR THEORY AND SIMULATIONS, 2003, 12 (04) : 243 - 250
  • [45] Multi-type electric vehicle load prediction based on Monte Carlo simulation
    Xing, Yong
    Li, Fan
    Sun, Ke
    Wang, Dan
    Chen, Tianyi
    Zhang, Zhe
    ENERGY REPORTS, 2022, 8 : 966 - 972
  • [46] Prediction on miscibility of silicone and gasoline components by Monte Carlo simulation
    Qingyin Li
    Dong Liu
    Linhua Song
    Pingping Wu
    Zifeng Yan
    Journal of Molecular Modeling, 2014, 20
  • [47] Research on Software Project Schedule Management Method based on Monte Carlo Simulation
    Zhang, Shuo
    Jin, Lan
    PROCEEDINGS OF 2020 IEEE 5TH INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC 2020), 2020, : 1605 - 1608
  • [48] Finite Element-Based Brownian Dynamics Simulation of Nanofiber Suspensions Using Monte Carlo Method
    Zhang, Dongdong
    Smith, Douglas E.
    JOURNAL OF MICRO AND NANO-MANUFACTURING, 2015, 3 (04):
  • [49] Prediction on miscibility of silicone and gasoline components by Monte Carlo simulation
    Li, Qingyin
    Liu, Dong
    Song, Linhua
    Wu, Pingping
    Yan, Zifeng
    JOURNAL OF MOLECULAR MODELING, 2014, 20 (05)
  • [50] Monte Carlo simulation for anisotropic error prediction in frameless stereotaxy
    Willems, PWA
    Noordmans, HJ
    van der Sprenkel, JWB
    Viergever, MA
    Tulleken, CAF
    CARS 2002: COMPUTER ASSISTED RADIOLOGY AND SURGERY, PROCEEDINGS, 2002, : 1072 - 1072