Automated Synthesis of Cyber-Physical Systems from Joint Controller/Architecture Specifications

被引:0
作者
Roy, Debayan [1 ]
Zhang, Licong [1 ]
Chang, Wanli [2 ,3 ]
Chakraborty, Samarjit [1 ]
机构
[1] Tech Univ Munich, Munich, Germany
[2] TUM CREATE, Singapore, Singapore
[3] Singapore Inst Technol, Singapore, Singapore
来源
2016 FORUM ON SPECIFICATION AND DESIGN LANGUAGES (FDL) | 2016年
基金
新加坡国家研究基金会;
关键词
TASK ASSIGNMENT; CONSTRAINTS; DESIGN;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
One emerging research direction to address the design of Cyber-Physical Systems (CPS) is the co-design of the architecture and the controllers. The co-design techniques integrate the design of control and architecture in an early phase and the parameters on both sides can be synthesized according to certain design objectives. This explores the characteristics on both sides to achieve more efficient design of such systems. In this paper, we give an overview of the automated synthesis of CPS from joint controller/architecture specifications by explaining the background and motivation for such methods and illustrating this design paradigm with a concrete example of a FlexRay-based embedded control system. Furthermore, we provide the future outlook in this direction by explaining possible extensions and the related challenges.
引用
收藏
页数:8
相关论文
共 23 条
[1]  
[Anonymous], 1997, COMPUTER CONTROLLED
[2]   Metropolis: An integrated electronic system design environment [J].
Balarin, F ;
Watanabe, Y ;
Hsieh, H ;
Lavagno, L ;
Passerone, C ;
Sangiovanni-Vincentelli, A .
COMPUTER, 2003, 36 (04) :45-+
[3]   Optimal integrated control and scheduling of networked control systems with communication constraints:: Application to a car suspension system [J].
Ben Gaid, Mohamed El Mongi ;
Cela, Arben ;
Hamam, Yskandar .
IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2006, 14 (04) :776-787
[4]  
Bordoloi U. D., 2012, 2012 7th IEEE International Symposium on Industrial Embedded Systems (SIES 2012). Proceedings, P94, DOI 10.1109/SIES.2012.6356574
[5]  
Davare A., 2007, DES VER C EXH SAN JO
[6]   Controller Area Network (CAN) schedulability analysis: Refuted, revisited and revised [J].
Davis, Robert I. ;
Burns, Alan ;
Bril, Reinder J. ;
Lukkien, Johan J. .
REAL-TIME SYSTEMS, 2007, 35 (03) :239-272
[7]  
Glass M, 2009, DES AUT CON, P43
[8]  
Goswami D, 2013, DES AUT TEST EUROPE, P1123
[9]  
Goswami D, 2011, DES AUT TEST EUROPE, P914
[10]  
Goswami D, 2012, DES AUT TEST EUROPE, P1227