Soft-computing approaches for rescheduling problems in a manufacturing industry

被引:9
作者
Acevedo-Chedid, Jaime [1 ]
Grice-Reyes, Jennifer [1 ]
Ospina-Mateus, Holman [1 ]
Salas-Navarro, Katherinne [2 ]
Santander-Mercado, Alcides [3 ]
Sana, Shib Sankar [4 ]
机构
[1] Univ Tecnol Bolivar, Dept Ind Engn, Cartagena, Colombia
[2] Univ Costa, Dept Prod & Innovat, Barranquilla, Colombia
[3] Univ Norte, Dept Ind Engn, Barranquilla, Colombia
[4] Kishore Bharati Bhagini Nivedita Coll, Kolkata 700060, India
基金
美国国家卫生研究院;
关键词
Flexible manufacturing system; scheduling; reactive scheduling; Petri net; memetics algorithm; GENETIC ALGORITHM; PETRI NETS; SEARCH ALGORITHM; SYSTEMS; MODEL; FMS; INVENTORY; SELECTION; SUBJECT;
D O I
10.1051/ro/2020077
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Flexible manufacturing systems as technological and automated structures have a high complexity for scheduling. The decision-making process is made difficult with interruptions that may occur in the system and these problems increase the complexity to define an optimal schedule. The research proposes a three-stage hybrid algorithm that allows the rescheduling of operations in an FMS. The novelty of the research is presented in two approaches: first is the integration of the techniques of Petri nets, discrete simulation, and memetic algorithms and second is the rescheduling environment with machine failures to optimize the makespan and Total Weighted Tardiness. The effectiveness of the proposed Soft computing approaches was validated with the bottleneck of heuristics and the dispatch rules. The results of the proposed algorithm show significant findings with the contrasting techniques. In the first stage (scheduling), improvements are obtained between 50 and 70% on performance indicators. In the second stage (failure), four scenarios are developed that improve the variability, flexibility, and robustness of the schedules. In the final stage (rescheduling), the results show that 78% of the instances have variations of less than 10% for the initial schedule. Furthermore, 88% of the instances support rescheduling with variations of less than 2% compared to the heuristics.
引用
收藏
页码:S2125 / S2159
页数:35
相关论文
共 61 条
[1]  
Acevedo J., 2006, THEISI U ANDES
[2]  
Acevedo J., 2006, 3 INT C PROD RES AM
[3]   An efficient hybridized genetic algorithm architecture for the flexible job shop scheduling problem [J].
Al-Hinai, Nasr ;
ElMekkawy, T. Y. .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2011, 23 (01) :64-85
[4]   Deadlock-Free Scheduling Method for Flexible Manufacturing Systems Based on Timed Colored Petri Nets and Anytime Heuristic Search [J].
Baruwa, Olatunde T. ;
Piera, Miquel Angel ;
Guasch, Antoni .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (05) :831-846
[5]   Petri net based decision system modeling in real-time scheduling and control of flexible automotive manufacturing systems [J].
Basak, Ozkan ;
Albayrak, Y. Esra .
COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 86 :116-126
[6]  
Cai ZhiCheng, 2018, IEEE INT C NETW SENS, P1
[7]  
Chedid J.A., 2017, ESPACIO, V38, P23
[8]   Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns [J].
Chen, J ;
Chen, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (09) :1927-1951
[9]  
Chen J, 2003, INT J ADV MANUF TECH, V21, P98
[10]   Petri net models for message manipulation and event monitoring in an FMS cell [J].
Cho, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (01) :231-250