Construction Safety Monitoring and Finite Element Analysis on the Supporting System of Tower Crane in Guangzhou West-Tower

被引:3
作者
Deng, Hao [1 ]
Xu, Jin [2 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Guangdong, Peoples R China
[2] Guangdong Provincial Acad Building Res, Inst Building Struct, Guangzhou, Guangdong, Peoples R China
来源
ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 4, PROCEEDINGS: MODELLING AND SIMULATION IN ENGINEERING | 2009年
关键词
tower crane; construction phase monitoring; finite element method; load combinations;
D O I
10.1109/ICIC.2009.326
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The West-Tower in Zhujiang New Town of Guangzhou covers an area of 451,926 square meters. The main turret has about 103 stories and 432 meters high, it will become the highest building and a new landmark building in Guangzhou upon to now. Guangzhou West-Tower is also one of the highest constructing complicated structures in China. Considered the complexity of this structure, to secure the safety of the construction stage, the structure was monitored during construction stage by Guangdong provincial academy of building research. This paper presents part results of the construction phase monitoring of Guangzhou West-Tower. Combined with the National Key Technology R&D Program in the 11th Five year Plan of China, the finite element model of the supporting system of tower crane is established to calculate the stress and deformation of bars under the conditions of four different loading states, which are compared with the on-site collected data to ensure that the main structure carried out safely and smoothly.
引用
收藏
页码:69 / +
页数:2
相关论文
共 6 条
[1]  
SUN Y, 2007, BUILDING CONSTRUCTIO, V29, P802
[2]  
TENG J, 2006, STRUDY APPL ONLINE M
[3]  
WANG MC, 2003, FINITE ELEMENT METHO, P776
[4]  
WU JY, 2006, REPORT CONSTRUCTION, P10
[5]  
YE QR, 2006, ANHUI ARCHITECTURE, V4
[6]  
2003, Patent No. 50017