Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India

被引:20
作者
Hasan, Abid [1 ]
Jha, Kumar Neeraj [2 ]
机构
[1] Hindustan Petr Corp Ltd, Ramanmandi Dispatch Stn, Bathinda 151001, Punjab, India
[2] Indian Inst Technol Delhi, Dept Civil Engn, New Delhi 110016, India
关键词
Incentive; Disincentive; Construction industry; Factor analysis; Contracting; IMPACT; INCENTIVES;
D O I
10.1061/(ASCE)CO.1943-7862.0001048
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Modern construction projects often include incentive/disincentive (I/D) provisions in order to serve a variety of different client objectives. Studies have shown both the advantages and disadvantages of using I/D clauses to improve performance. In India, out of 82 construction projects of varied size and nature investigated, only 14 projects of a critical nature were found to have I/D clauses in their contract document. The present study was carried out to identify various attributes affecting the successful use of I/D clauses in achieving their intended purpose. A total of 25 attributes were identified based on a literature review and structured personal interviews that present practical difficulties while using the I/D contracting method and thus, prevent I/D clauses from unlocking their true potential. These attributes have been evaluated based on the results of a survey conducted among experienced professionals working in the Indian construction industry. Factor analysis conducted on responses associated with important attributes identified five key factors: difficulty in contract management, additional effort by project participants, adverse effect on the working relationship of the client and contractor, increased responsibility of the client, and client's reluctant top management. These factors also explain the reason behind the low acceptance of the I/D contracting method in developing construction markets. Case studies performed in four construction projects show that three out of four projects discussed were delayed due to inadequate understanding and wrong implementation of I/D provisions. This paper will be of interest to academicians and practitioners interested in the use of the I/D contracting method in construction projects. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 57 条
  • [1] SCHEDULE-BASED CONSTRUCTION INCENTIVES
    ABUHIJLEH, SF
    IBBS, CW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 430 - 443
  • [2] Strategies for Planned Project Acceleration
    Anderson, Stuart
    Shane, Jennifer S.
    Schexnayder, Cliff
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (05): : 372 - 381
  • [3] [Anonymous], 2001, CHANN TUNN RAIL LINK
  • [4] [Anonymous], 2005, INT J PROJECT MANAGE, DOI [DOI 10.1016/J.IJPR0MAN.2004.09.001, DOI 10.1016/J.IJPROMAN.2004.09.001]
  • [5] [Anonymous], MICR PROJ COMP SOFTW
  • [6] [Anonymous], P 6 INT C CONSTR 21
  • [7] [Anonymous], 2006, TERM PFI CONTR NAT P
  • [8] [Anonymous], PRIM COMP SOFTW
  • [9] [Anonymous], LOND UND PPP WER THE
  • [10] Incentive/disincentive provisions in highway contracts
    Arditi, D
    Khisty, CJ
    Yasamis, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (03): : 302 - 307