Assessing the Impacts of an IT LPS Support System on Schedule Accomplishment in Construction Projects

被引:14
作者
Ignacio Lagos, Camilo [1 ]
Fernando Herrera, Rodrigo [1 ,2 ,3 ]
Fernando Alarcon, Luis [1 ]
机构
[1] Pontificia Univ Catolica Chile, Prod Management Ctr, Santiago 4860, Chile
[2] Pontificia Univ Catolica Valparaiso, Sch Civil Engn, Valparaiso 23662804, Chile
[3] Univ Politecn Valencia, Camino Vera S-N, E-46022 Valencia, Spain
关键词
Last Planner System; Information technologies; Implementation level; Project performance; Schedule accomplishment;
D O I
10.1061/(ASCE)CO.1943-7862.0001691
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper seeks to identify improvements in the level of implementation of the Last Planner System (LPS) with the use of information technologies (IT) based on its methodology. In addition, we correlate the level of implementation of specific LPS components to the plan percent complete (PPC). The conjoint analysis of IT benefits in implementation and correlation to PPC allowed identification of two critical components: the standardization of the planning and control process, which can be quantitatively assessed by the PPC, and the systematic analysis and removal of constraints assessed through the percentage of constraints removed (PCR). A sample of 50 projects was used to corroborate that projects that have higher PPC and PCR also have better performance, measured by the schedule accomplishment and number of noncompliances. Consequently, results inferred that projects that use IT systems based on LPS have a more systematic planning and control and better constraint management that also correspond to better schedule accomplishment and less noncompliance.
引用
收藏
页数:10
相关论文
共 33 条
[1]  
Alarcon L.F., 2003, P 11 ANN C INT GROUP
[2]  
Alarcon L. F., 2003, P CONSTR RES C CONST
[3]  
Alarcon L.F., 2014, 22nd Annual Conference of the International Group for Lean Construction, P547
[4]  
Alarcon LF., 2005, Thirteenth Annual Conference of the International Group for Lean Construction (IGLC-13), July, Sydney, Australia, P387
[5]   Improving construction management practice with the Last Planner System: a case study [J].
AlSehaimi, Abdullah ;
Fazenda, Patricia ;
Koskela, Lauri .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (01) :51-+
[6]  
[Anonymous], 1969, DELPHI METHOD EXPT S
[7]  
[Anonymous], 2002, THE DELPHI METHOD
[8]   Shielding production: Essential step in production control [J].
Ballard, G ;
Howell, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01) :11-17
[9]  
Ballard G., 2000, The Last Planner System of Production Control
[10]  
Bernardes M., 2002, 10th Annual Conference of the International Groupfor Lean Construction, P1