Make-to-order scheduling in foundry semiconductor fabrication

被引:16
作者
Kang, Kyung Hwan [1 ]
Lee, Young Hoon [1 ]
机构
[1] Yonsei Univ, Dept Informat & Ind Engn, Seoul 120749, South Korea
关键词
semiconductor fabrication; stepper scheduling; make-to-order;
D O I
10.1080/00207540600792416
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
On-time delivery is one of the performance measurements in the make-to-order semiconductor industry. Many control policies, such as input dispatching rules, CONWIP and optimization-based rules, have been implemented based on the managing objectives of the fabrication line. These models focus, however, mainly on the high throughput, short cycle time and high equipment utilization which are proper for the mass production in the semiconductor industry. In this paper, three due date-based production control models are suggested: the target control model, the movement control model and the WIP control model. Mathematical formulations using linear programming are given, and the effectiveness of the proposed models is evaluated by computational experiment. It is shown that suggested models outperform models in the literature with respect to the throughput and on-time delivery.
引用
收藏
页码:615 / 630
页数:16
相关论文
共 18 条
[1]  
[Anonymous], HAYSTACK SYNDROME
[2]  
[Anonymous], P INT C MOD AN SEM M
[3]   Heuristic PAC model for hybrid MTO and MTS production environment [J].
Chang, SH ;
Pai, PF ;
Yuan, KJ ;
Wang, BC ;
Li, RK .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (03) :347-358
[4]   TRADE-OFFS IN CYCLE TIME MANAGEMENT - HOT LOTS [J].
EHTESHAMI, B ;
PETRAKIAN, RG ;
SHABE, PM .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1992, 5 (02) :101-106
[5]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[6]   A SCHEDULING RULE FOR JOB RELEASE IN SEMICONDUCTOR FABRICATION [J].
GLASSEY, CR ;
RESENDE, MGC .
OPERATIONS RESEARCH LETTERS, 1988, 7 (05) :213-217
[7]   Shift scheduling for steppers in the semiconductor wafer fabrication process [J].
Kim, S ;
Yea, SH ;
Kim, B .
IIE TRANSACTIONS, 2002, 34 (02) :167-177
[8]  
LEE BJ, 2005, UNPUB INT J PROD RES
[9]   Push-pull production planning of the re-entrant process [J].
Lee, YH ;
Lee, B .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (11-12) :922-931
[10]   Manufacturing cycle time reduction using balance control in the semiconductor fabrication line [J].
Lee, YH ;
Kim, T .
PRODUCTION PLANNING & CONTROL, 2002, 13 (06) :529-540