Bridge live load models from WIM data

被引:113
作者
Miao, TJ [1 ]
Chan, THT [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Kowloon, Hong Kong, Peoples R China
关键词
average daily truck traffic; equivalent base length; extreme daily events; Kolmogorov-Sminorv method; Monte Carlo simulation; loading models; maximum observed load; probability level; statistical analysis; weigh-in-motion;
D O I
10.1016/S0141-0296(02)00034-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the development of a new methodology for deriving highway bridge live load models for short span bridges. The development is based on a 'repeatable' methodology to obtain extreme daily moments and shears using 10 years Hong Kong weigh-in-motion (WIM) data as compared to the traditional normal probability paper approach. The methodology can also be applied to the development of bridge live loading models in other parts of the world. Two types of loading are proposed. A methodology based on the equivalent base length concept is used to derive the lane loading model and the standard truck loading model is developed based on a statistical approach. The developed lane and truck loadings are compared with other loading models adopted locally and overseas. It is the first time in Hong Kong the bridge design loading is developed based on actual acquired load data using statistical and probabilistic approach. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:1071 / 1084
页数:14
相关论文
共 7 条
  • [1] *AM ASS STAT HIGHW, 1992, STAND SPEC HIGHW BRI
  • [2] [Anonymous], PROPOSED ONTARIO BRI
  • [3] *BRIT STAND I, 1984, BS5400 BRIT STAND 2
  • [4] Miao T. J., 2001, DISSERT ABSTR, V62, P4668
  • [5] LOAD MODEL FOR BRIDGE DESIGN CODE
    NOWAK, AS
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (01) : 36 - 49
  • [6] NOWAK AS, 1997, LIFETIME RELIABILITY
  • [7] *TRANSP DEP HONG K, 1997, TRANSP PLANN DES MAN, V1