COORDINATION OF PRODUCTION AND TRANSPORTATION IN SUPPLY CHAIN SCHEDULING

被引:7
作者
Pei, Jun [1 ,2 ]
Pardalos, Panos M. [2 ,3 ]
Liu, Xinbao [1 ,4 ]
Fan, Wenjuan [1 ,5 ]
Yang, Shanlin [1 ,4 ]
Wang, Ling
机构
[1] Hefei Univ Technol, Sch Management, Hefei 230009, Peoples R China
[2] Univ Florida, Dept Ind & Syst Engn, Ctr Appl Optimizat, Gainesville, FL 32611 USA
[3] Natl Res Univ Higher Sch Econ, Lab Algorithms & Technol Networks Anal, Nizhnii Novgorod 603093, Russia
[4] Minist Educ, Key Lab Process Optimizat & Intelligent Decis Mak, Hefei 230009, Peoples R China
[5] N Carolina State Univ, Dept Comp Sci, Raleigh, NC 27695 USA
基金
中国国家自然科学基金;
关键词
Supply chain scheduling; batching; transportation; heuristic algorithm; SEQUENCE-DEPENDENT SETUP; DUE-DATE ASSIGNMENT; GENETIC ALGORITHM; BOUND ALGORITHM; TARDY JOBS; DELIVERY; TIMES; FLOWSHOP; OPTIMIZATION; CAPACITY;
D O I
10.3934/jimo.2015.11.399
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates a three-stage supply chain scheduling problem in the application area of aluminium production. Particularly, the first and the third stages involve two factories, i.e., the extrusion factory of the supplier and the aging factory of the manufacturer, where serial batching machine and parallel batching machine respectively process jobs in different ways. In the second stage, a single vehicle transports jobs between the two factories. In our research, both setup time and capacity constraints are explicitly considered. For the problem of minimizing the makespan, we formalize it as a mixed integer programming model and prove it to be strongly NP-hard. Considering the computational complexity, we develop two heuristic algorithms applied in two different cases of this problem. Accordingly, two lower bounds are derived, based on which the worst case performance is analyzed. Finally, different scales of random instances are generated to test the performance of the proposed algorithms. The computational results show the effectiveness of the proposed algorithms, especially for large-scale instances.
引用
收藏
页码:399 / 419
页数:21
相关论文
共 38 条
[1]   Supply chain scheduling: Sequence coordination [J].
Agnetis, Alessandro ;
Hall, Nicholas G. ;
Pacciarelli, Dario .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (15) :2044-2063
[2]   Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints [J].
Allaoui, H ;
Artiba, A .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 47 (04) :431-450
[3]  
[Anonymous], 2002, Handbook of Applied Optimization
[4]  
Averbakh I., 2007, J OPERATIONAL RES, V181, P500
[5]   A branch-and-price algorithm for an integrated production and inventory routing problem [J].
Bard, Jonathan F. ;
Nananukul, Narameth .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (12) :2202-2217
[6]   Realistic two-stage flowshop batch scheduling problems with transportation capacity and times [J].
Behnamian, J. ;
Ghomi, S. M. T. Fatemi ;
Jolai, F. ;
Amirtaheri, O. .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (02) :723-735
[7]   Multi-objective analysis of an integrated supply chain scheduling problem [J].
Cakici, Eray ;
Mason, Scott J. ;
Kurz, Mary E. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) :2624-2638
[8]   An adaptive genetic algorithm with dominated genes for distributed scheduling problems [J].
Chan, FTS ;
Chung, SH ;
Chan, PLY .
EXPERT SYSTEMS WITH APPLICATIONS, 2005, 29 (02) :364-371
[9]   Machine scheduling with job delivery coordination [J].
Chang, YC ;
Lee, CY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (02) :470-487
[10]   Applied column generation-based approach to solve supply chain scheduling problems [J].
Chang, Yung-Chia ;
Chang, Kuei-Hu ;
Chang, Teng-Kai .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (13) :4070-4086