Crossrail project: a deep-mined station on the Elizabeth line, London

被引:3
|
作者
St John, Adrian [1 ]
Barker, John [2 ]
Frost, Stephen [3 ]
Harris, David [4 ]
机构
[1] BFK JV, Kier Infrastruct, London, England
[2] Crossrail, London Underground Stn, Engn, London, England
[3] Arup Atkins JV, Civil, London, England
[4] Mott MacDonald, Croydon, England
关键词
tunnels & tunnelling; geotechnical engineering; project management; COURT ROAD STATION; UK;
D O I
10.1680/jcien.16.00011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes some of the key challenges and lessons learned in creating a deep-mined, sprayed concretelined station shell for London's new Elizabeth line. Tottenham Court Road station was one of five such stations on the 14.8 pound billion Crossrail project to deliver a new 118 km east-west railway across the UK capital by 2019. Creation of two 240 m long platform tunnels in a dense, urban environment required the development of unique design and construction solutions, including ground improvement and safeguarding measures to mitigate ground movement. Strong collaboration and effective technical and construction coordination across the many asset interfaces were key factors in achieving a successful outcome.
引用
收藏
页码:47 / 56
页数:10
相关论文
共 50 条