Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder

被引:2
作者
Liu, Lanjun [1 ,2 ]
Liu, Denghui [3 ]
Wu, Han [2 ]
Wang, Junwu [2 ]
机构
[1] Wuhan Inst Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[2] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[3] China Construct First Grp Corp Ltd, Beijing 100161, Peoples R China
基金
芬兰科学院;
关键词
NEURAL-NETWORK; PROJECTS; ACCURACY; CLASSIFICATION; OVERRUNS; POWER;
D O I
10.1155/2020/8824388
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To accurately predict the construction costs of foundation pit projects, a model based on the stacked denoising autoencoder (SDAE) is constructed in this work. The influencing factors of foundation pit project construction costs are identified from the four attributes of construction cost management, namely, engineering, the environment, the market, and management. Combined with Chinese national standards and the practice of foundation pit project management, a method of the quantization of the influencing factors is presented. 60 deep foundation pit projects in China are selected to obtain 13 main characteristic factors affecting these project construction cost by using the rough set. Then, considering the advantages of the SDAE in dealing with complex nonlinear problems, a prediction model of foundation pit project construction costs is created. Finally, this paper employs these 60 projects for a case analysis. The case study demonstrates that, compared with the actual construction costs, the calculation error of the proposed method is less than 3%, and the average error is only 1.54%. In addition, three error analysis tools commonly used in machine learning (the determination coefficient, root mean square error, and mean absolute error) emphasize that the calculation accuracy of the proposed method is notably higher than those of other methods (Chinese national code, the multivariate return method, the BP algorithm, the BP model optimized by the genetic algorithm, the support vector machine, and the RBF model). The relevant research results of this paper provide a useful reference for the prediction of the construction costs of foundation pit projects.
引用
收藏
页数:16
相关论文
共 54 条
[21]   Estimating classification error rate: Repeated cross-validation, repeated hold-out and bootstrap [J].
Kim, Ji-Hyun .
COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2009, 53 (11) :3735-3745
[22]   Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms [J].
Kim, Kyong Ju ;
Kim, Kyoungmin .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (06) :499-505
[23]   Modeling groundwater fluctuations by three different evolutionary neural network techniques using hydroclimatic data [J].
Kisi, Ozgur ;
Alizamir, Meysam ;
Zounemat-Kermani, Mohammad .
NATURAL HAZARDS, 2017, 87 (01) :367-381
[24]   Prediction of site overhead costs with the use of artificial neural network based model [J].
Lesniak, Agnieszka ;
Juszczyk, Michal .
ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2018, 18 (03) :973-982
[25]   Groundwater Level Prediction for the Arid Oasis of Northwest China Based on the Artificial Bee Colony Algorithm and a Back-propagation Neural Network with Double Hidden Layers [J].
Li, Huanhuan ;
Lu, Yudong ;
Zheng, Ce ;
Yang, Mi ;
Li, Shuangli .
WATER, 2019, 11 (04)
[26]   Deep Learning with Stacked Denoising Auto-Encoder for Short-Term Electric Load Forecasting [J].
Liu, Peng ;
Zheng, Peijun ;
Chen, Ziyu .
ENERGIES, 2019, 12 (12)
[27]   LMAE: A large margin Auto-Encoders for classification [J].
Liu, Weifeng ;
Ma, Tengzhou ;
Xie, Qiangsheng ;
Tao, Dapeng ;
Cheng, Jun .
SIGNAL PROCESSING, 2017, 141 :137-143
[28]   Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives [J].
Love, Peter E. D. ;
Edwards, David J. .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2013, 9 (11) :1118-1135
[29]   A Review of Deep Learning Research [J].
Mu, Ruihui ;
Zeng, Xiaoqin .
KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2019, 13 (04) :1738-1764
[30]   Effects of construction projects schedule overruns: A case of the Gauteng Province, South Africa [J].
Mukuka, Mulenga ;
Aigbavboa, Clinton ;
Thwala, Wellington .
6TH INTERNATIONAL CONFERENCE ON APPLIED HUMAN FACTORS AND ERGONOMICS (AHFE 2015) AND THE AFFILIATED CONFERENCES, AHFE 2015, 2015, 3 :1690-1695