Three-stage optimization method for the problem of scheduling additional trains on a high-speed rail corridor

被引:43
|
作者
Gao, Yuan [1 ]
Kroon, Leo [2 ,3 ]
Yang, Lixing [1 ]
Gao, Ziyou [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
[3] Netherlands Railways, Proc Qual & Innovat, NL-3500 HA Utrecht, Netherlands
基金
中国国家自然科学基金;
关键词
Train timetabling problem; Additional trains; High-speed rail; Optimization; ALGORITHMS; MODEL;
D O I
10.1016/j.omega.2017.08.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
When scheduling additional trains into a busy timetable, the arrival and departure times of existing trains may have to be adjusted. Taking a high-speed rail corridor as the research object, we formulate a bi-objective mixed integer linear programming model to generate a new timetable for both of the additional trains and the existing trains, which minimizes the total travel time of the additional trains and minimizes the adjustment on the existing trains at the same time. In order to better model the operations of trains on the high-speed rail line, the capacities of the stations and the acceleration/deceleration times are all taken into account Furthermore, we propose a three-stage optimization method to solve the bi-objective model. Based on the real data of the Hangzhou-Ningbo-Wenzhou high-speed rail corridor in China, computational experiments are carried out to test the proposed model and optimization method. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:175 / 191
页数:17
相关论文
共 50 条
  • [1] Development of Two-Stage Hybrid Method to Solve High-Speed Rail Train Scheduling Problem
    Jong, Jyh-Cherng
    Chang, Sloan
    Lai, Yung-Cheng
    TRANSPORTATION RESEARCH RECORD, 2013, (2374) : 44 - 54
  • [2] HIGH-SPEED TRAINS ON BRITISH RAIL
    CAMPBELL, IM
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 810 - 812
  • [3] Dynamic Scheduling Method of High-speed Trains Based on Improved Particle Swarm Optimization
    Yu, Shengping
    Lin, Bo
    Zhang, Tao
    Dai, Xuewu
    Liu, Qiang
    2018 INTERNATIONAL CONFERENCE ON INTELLIGENT RAIL TRANSPORTATION (ICIRT), 2018,
  • [4] Development of Multicriteria Decision Method for Evaluating High-Speed Rail Corridor
    Sperry, Benjamin R.
    Mueller, Jon
    Hunter-Zaworski, Katharine
    TRANSPORTATION RESEARCH RECORD, 2013, (2374) : 26 - 34
  • [5] Rail Corrugation Suppressing Method on Braking Sections of High-Speed Trains
    Cui X.
    Tang C.
    Bao P.
    Qi W.
    Li J.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2023, 58 (03): : 656 - 664
  • [6] Optimization of high-level preventive maintenance scheduling for high-speed trains
    Lin Boliang
    Wu Jianping
    Lin Ruixi
    Wang Jiaxi
    Wang Hui
    Zhang Xuhui
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 183 : 261 - 275
  • [7] Multimedia Services Scheduling Optimization Using Femtocell on High-Speed Trains
    Zhang, Hongting
    Wu, Hsiao-Chun
    Guo, Limei
    2015 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE (WCNC), 2015, : 464 - 469
  • [8] Mind the services! High-speed rail cities bypassed by high-speed trains
    Moyano A.
    Dobruszkes F.
    Case Studies on Transport Policy, 2017, 5 (04) : 537 - 548
  • [9] The three-stage assembly flowshop scheduling problem
    Koulamas, C
    Kyparisis, GJ
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 689 - 704
  • [10] Transportation - High-speed rail hits Northeast Corridor
    Aveni, M
    CIVIL ENGINEERING, 2001, 71 (01): : 24 - 25