The choice substantiation method of road construction equipment for mining enterprises

被引:3
|
作者
Afanasyev, A. S. [1 ]
Egoshin, A. M. [2 ]
Alekseev, S., V [2 ]
机构
[1] St Petersburg Min Univ, 21 Line, St Petersburg 199106, Russia
[2] Mil Acad Logist, 8 B Admiral Makarov Embankment, St Petersburg 199034, Russia
关键词
D O I
10.1088/1742-6596/1399/3/033021
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Selection of types and brands of road construction equipment for building quarry roads inside mining enterprises is an important task in a free market. In this case, the main criterion is the minimization of costs, which depend on the rational distribution of equipment among the work objects. Such a rational distribution is proposed in this technique, taking into account the operating conditions of the equipment.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Modeling and Optimizing Fuel Usage of On-Road Construction Equipment
    Barati, Khalegh
    Shen, Xuesong
    CONSTRUCTION RESEARCH CONGRESS 2018: SUSTAINABLE DESIGN AND CONSTRUCTION AND EDUCATION, 2018, : 198 - 207
  • [32] Review of international information on construction and road-building equipment
    Anon
    Stroitel'nye i Dorozhnye Mashiny, 2001, (10):
  • [33] Review of international information of construction and road-building equipment
    Stroitel'nye i Dorozhnye Mashiny, 2003, (03):
  • [34] Prediction of maintenance cost for road construction equipment: a case study
    Bayzid, Sharif Mohammad
    Mohamed, Yasser
    Al-Hussein, Maria
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (05) : 480 - 492
  • [35] EXPERT SYSTEM FOR EARTHMOVING EQUIPMENT SELECTION IN ROAD CONSTRUCTION.
    Alkass, Sabah
    Harris, Frank
    Journal of Construction Engineering and Management, 1988, 114 (03) : 426 - 440
  • [36] Modeling resale value of road compaction equipment: a data mining approach
    Chowdhery, Syed Azad
    Bertoni, Marco
    IFAC PAPERSONLINE, 2018, 51 (11): : 1101 - 1106
  • [37] "One Belt One Road"- "Going out" Route Choice of Chinese Enterprises
    Hou, Yudong
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND ENGINEERING INNOVATION, 2015, 12 : 1691 - 1694
  • [38] CONTRIBUTION TO SUBSTANTIATION OF CHOICE OF THE METHOD OF OPERATION IN VARICOSE DISEASE OF LOWER-EXTREMITIES
    ZAVIYALOV, ED
    VESTNIK KHIRURGII IMENI I I GREKOVA, 1987, 139 (10): : 57 - 60
  • [39] Optimized Construction Equipment Allocation Method for Highway Construction Projects
    Choi, Jaehyun
    Song, Hojeong
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3120 - 3125
  • [40] Potential use of coltan mining waste rock in road construction
    Ally, Alinabiwe Nyamuhanga
    Blanche, Manjia Marcelline
    Nana, Ursula Joyce Merveilles Pettang
    Grace, Masika Muhiwa
    Zang, Elodie Ruffine
    Francois, Ngapgue
    Pettang, Chrispin
    ADVANCES IN CIVIL AND ARCHITECTURAL ENGINEERING, 2023, 14 (27): : 14 - 31