Risk mitigation in large-scale systems: Lessons from high reliability organizations

被引:67
作者
Grabowski, M
Roberts, K
机构
[1] DEPT DECIS SCI & ENGN SYST,TROY,NY
[2] UNIV CALIF BERKELEY,HAAS SCH BUSINESS,BERKELEY,CA 94720
关键词
D O I
10.2307/41165914
中图分类号
F [经济];
学科分类号
02 ;
摘要
This article argues that we should turn our attention from single organizations to systems of organizations if we are to manage in a way that reduces the potential for catastrophic outcomes in organizations. Risk mitigation measures for large-scale systems are derived from research on high reliability organizations (HROs). The article focuses on characteristics similar to both types of systems-which include simultaneous autonomy and interdependence, intended and unintended consequences of behavior, long incubation periods during which problems can arise, and risk migration-and shows how risk mitigation principles that evolved from HRO research can be applied to large-scale systems.
引用
收藏
页码:152 / &
页数:12
相关论文
共 42 条
[1]  
Ammons J. C., 1988, Annals of Operations Research, V15, P313, DOI 10.1007/BF02186801
[2]  
[Anonymous], 5 DIMENSION
[3]  
[Anonymous], 1993, ABLAZE
[4]  
[Anonymous], 1994, HOSTAGES EACH OTHER
[5]   CLOSING THE GAP - TRANSIT CONTROL FOR HAZARDOUS MATERIAL FLOW [J].
BEROGGI, GEG ;
WALLACE, WA .
JOURNAL OF HAZARDOUS MATERIALS, 1991, 27 (01) :61-75
[6]  
BLEECKER SE, 1994, FUTURIST, V28, P9
[7]  
BURNS RD, 1989, IEEE ASME JOINT C
[8]   REAL-TIME DISTURBANCE CONTROL [J].
CHANDRASEKARAN, B ;
BHATNAGAR, R ;
SHARMA, DD .
COMMUNICATIONS OF THE ACM, 1991, 34 (08) :32-47
[9]  
Chesbrough HW, 1996, HARVARD BUSINESS JAN, P65
[10]  
Evan W. M., 1966, Approaches to Organizational Design, P175