Novel architectures and operation modes of Distribution Network to increase DG integration

被引:0
作者
Hadjsaid, N. [1 ]
Alvarez-Herault, M. [1 ]
Caire, R. [1 ]
Raison, B. [2 ,3 ]
Descloux, J. [1 ]
Bienia, W. [4 ,5 ]
机构
[1] Grenoble Inst Technol, G2Elab, Grenoble Elect Engn Lab, Grenoble, France
[2] Univ Joseph Fourier, Grenoble, France
[3] G2Elab, Grenoble, France
[4] Grenoble INP, Grenoble, France
[5] G SCOP, Grenoble, France
来源
IEEE PES GENERAL MEETING | 2010年
关键词
Distribution Network; Planning; Distributed Generation; Partially Meshed Grids; Monte Carlo Method; GENERATION; ALGORITHM;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Nowadays, distribution networks are facing tremendous challenges. Actually, the opening of the energy market, the wish to preserve the environment and the reduction of fossil energy stocks have lead to use more and more distributed, renewable and local energy resources, such as wind and photovoltaic generators. These generating units are mostly connected to the distribution networks. With the increase of the penetration rate of these generation facilities, the traditional operation as well as planning of the concerned networks may need to evolve. In order to face this situation and offer increased network capabilities to support these new technologies, the distribution network has to switch to a flexible and smart network. To achieve these goals, two research paths are considered: the new architectures and the development of intelligent embedded systems. This paper deals with new architectures and particularly partially meshed distribution networks. It proposes a Monte Carlo algorithm as an efficient tool for analysing and assessing the relationship between grid architecture and DG penetration rate. Simulation results on a real urban French distribution networks have showed the effectiveness of the method with respect to grid planning. Particularly, it has demonstrated that evolving distribution grid architectures towards a partially and adapted meshed structure increases DG penetration level.
引用
收藏
页数:6
相关论文
共 22 条
[1]  
ABADIE P, 2008, J OFFICIEL REPUBLIQU
[2]  
Ackermann T, 2002, IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS, P1357, DOI 10.1109/TDC.2002.1177677
[3]  
[Anonymous], 2003, IEEE STAND
[4]  
Cannas B, 1999, IEEE
[5]  
Celli G, 2004, 2004 IEEE PES POWER SYSTEMS CONFERENCE & EXPOSITION, VOLS 1 - 3, P709
[6]   A multiobjective evolutionary algorithm for the sizing and siting of distributed generation [J].
Celli, G ;
Ghiani, E ;
Mocci, S ;
Pilo, F .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :750-757
[7]  
Celli G., 2002, IEEE
[8]  
Celli G, 2005, CIGRE S 2005
[9]  
Celli G., CIRED 2005
[10]  
Celli G., 2001, IEEE