Evaluation of 4D BIM tools applicability in construction planning efficiency

被引:50
作者
Martins, Savio Santana [1 ]
Jorge Evangelista, Ana Catarina [2 ]
Hammad, Ahmed W. A. [3 ]
Tam, Vivian W. Y. [4 ]
Haddad, Assed [5 ]
机构
[1] Univ Fed Fluminense, Sch Civil Engn, Rio De Janeiro, Brazil
[2] Sch Civil Engn, Engn Inst Technol, Perth, WA, Australia
[3] Univ New South Wales, Fac Built Environm, Sydney, NSW, Australia
[4] Western Sydney Univ, Sch Built Environm, Sydney, NSW, Australia
[5] Univ Fed Rio de Janeiro, Escola Politecn, Programa Engn Ambiental, Rio De Janeiro, Brazil
关键词
4D; BIM; planning; cost; construction; sustainability; simulation; DEMOLITION WASTE MANAGEMENT; LIFE-CYCLE ASSESSMENT; ENVIRONMENTAL IMPACTS; IMPLEMENTATION; TECHNOLOGY; BARRIERS; PROJECT;
D O I
10.1080/15623599.2020.1837718
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Worldwide the construction industry presents a significant demand for new technologies ensuring certainty, cost-effectiveness and time efficiency. Modern construction relies on digital resources, and one of the most prominent novelties is Building Information Modelling (BIM). Construction planning effectiveness is based on clear communication and integration between project planners and other participants, such as engineers, architects, suppliers, and workforce. The possible connection between 3 D models and time or scheduling potentially reduces misconception risks and lack of information to avoid re-scheduling and project delivery delays. This study aims to investigate the integration of Revit, Navisworks, Tally and Green Building Studio for identifying the challenges in applying 4 D BIM technology using a case study in a developing country (Brazil). The research method used comprised these steps: objectives definition, literature review, development of the 4 D analysis and evaluation, case study for validation with comparison to other comparable and contrasting studies, and discussion of the results. This paper demonstrates the feasibility and challenges to adopt BIM technology to thrive better communication for teams and stakeholders through the various construction stages via visual representation. Additionally, despite the obstacles and difficulties to integrate different software, it is beneficial to the decision-makers, not only focus on the constructability perspective but project's environmental impacts, such as energy efficiency and global warming effect.
引用
收藏
页码:2987 / 3000
页数:14
相关论文
共 47 条
[31]  
KT Innovations, 2019, TALL OV
[32]  
Li Z, 2014, ANN ACAD MED SINGAPO, V43, pS16
[33]   A BIM approach for construction safety: applications, barriers and solutions [J].
Marefat, Akbar ;
Toosi, Hossein ;
Hasankhanlo, Reza Mahmoudi .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (09) :1855-1877
[34]   Integrated optimization with building information modeling and life cycle assessment for generating energy efficient buildings [J].
Najjar, Mohammad ;
Figueiredo, Karoline ;
Hammad, Ahmed W. A. ;
Haddad, Assed .
APPLIED ENERGY, 2019, 250 :1366-1382
[35]   Integration of BIM and LCA: Evaluating the environmental impacts of building materials at an early stage of designing a typical office building [J].
Najjar, Mohammad ;
Figueiredo, Karoline ;
Palumbo, Mariana ;
Haddad, Assed .
JOURNAL OF BUILDING ENGINEERING, 2017, 14 :115-126
[36]   Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design [J].
Najjar, Mohammad K. ;
Figueiredo, Karoline ;
Jorge Evangelista, Ana Catarina ;
Hammad, Ahmed W. A. ;
Tam, Vivian W. Y. ;
Haddad, Assed .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) :541-555
[37]   Integrating Parametric Analysis with Building Information Modeling to Improve Energy Performance of Construction Projects [J].
Najjar, Mohammad K. ;
Tam, Vivian W. Y. ;
Di Gregorio, Leandro Torres ;
Evangelista, Ana Catarina Jorge ;
Hammad, Ahmed W. A. ;
Haddad, Assed .
ENERGIES, 2019, 12 (08)
[38]   Enhancing Facility Management through BIM 6D [J].
Nical, Aleksander K. ;
Wodynski, Wojciech .
5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 :299-306
[39]   Life cycle assessment of construction and demolition waste management in a large area of Sao Paulo State, Brazil [J].
Rosado, Lais Peixoto ;
Vitale, Pierluca ;
Penteado, Carmenlucia S. G. ;
Arena, Umberto .
WASTE MANAGEMENT, 2019, 85 :477-489
[40]   Assessing usefulness of 4D BIM tools in risk mitigation strategies [J].
Sloot, R. N. F. ;
Heutink, A. ;
Voordijk, J. T. .
AUTOMATION IN CONSTRUCTION, 2019, 106