Evaluation of 4D BIM tools applicability in construction planning efficiency

被引:45
作者
Martins, Savio Santana [1 ]
Jorge Evangelista, Ana Catarina [2 ]
Hammad, Ahmed W. A. [3 ]
Tam, Vivian W. Y. [4 ]
Haddad, Assed [5 ]
机构
[1] Univ Fed Fluminense, Sch Civil Engn, Rio De Janeiro, Brazil
[2] Sch Civil Engn, Engn Inst Technol, Perth, WA, Australia
[3] Univ New South Wales, Fac Built Environm, Sydney, NSW, Australia
[4] Western Sydney Univ, Sch Built Environm, Sydney, NSW, Australia
[5] Univ Fed Rio de Janeiro, Escola Politecn, Programa Engn Ambiental, Rio De Janeiro, Brazil
关键词
4D; BIM; planning; cost; construction; sustainability; simulation; DEMOLITION WASTE MANAGEMENT; LIFE-CYCLE ASSESSMENT; ENVIRONMENTAL IMPACTS; IMPLEMENTATION; TECHNOLOGY; BARRIERS; PROJECT;
D O I
10.1080/15623599.2020.1837718
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Worldwide the construction industry presents a significant demand for new technologies ensuring certainty, cost-effectiveness and time efficiency. Modern construction relies on digital resources, and one of the most prominent novelties is Building Information Modelling (BIM). Construction planning effectiveness is based on clear communication and integration between project planners and other participants, such as engineers, architects, suppliers, and workforce. The possible connection between 3 D models and time or scheduling potentially reduces misconception risks and lack of information to avoid re-scheduling and project delivery delays. This study aims to investigate the integration of Revit, Navisworks, Tally and Green Building Studio for identifying the challenges in applying 4 D BIM technology using a case study in a developing country (Brazil). The research method used comprised these steps: objectives definition, literature review, development of the 4 D analysis and evaluation, case study for validation with comparison to other comparable and contrasting studies, and discussion of the results. This paper demonstrates the feasibility and challenges to adopt BIM technology to thrive better communication for teams and stakeholders through the various construction stages via visual representation. Additionally, despite the obstacles and difficulties to integrate different software, it is beneficial to the decision-makers, not only focus on the constructability perspective but project's environmental impacts, such as energy efficiency and global warming effect.
引用
收藏
页码:2987 / 3000
页数:14
相关论文
共 47 条
  • [1] Abdirad H., 2017, ARCHIT ENG DES MANAG, V13, P1
  • [2] Factors influencing BIM adoption in emerging markets???the case of India
    Ahuja, Ritu
    Sawhney, Anil
    Jain, Megha
    Arif, Mohammed
    Rakshit, Samya
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (01) : 65 - 76
  • [3] Improving construction planning through 4D planning
    Allen, Chris
    Smallwood, John
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2008, 6 (01) : 7 - 20
  • [4] Amoaha E.K., 2019, P INT S AUTOMATION R, P1081
  • [5] [Anonymous], 2018, SUSTAINABILITY BASEL, DOI DOI 10.3390/SU10093331
  • [6] Autodesk, 2013, GREEN BUILD STUD
  • [7] Bridging the digital divide gap in BIM technology adoption
    Ayinla, Kudirat Olabisi
    Adamu, Zulfikar
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (10) : 1398 - 1416
  • [8] CONSTRUCTION PROJECTS SCHEDULING USING GIS TOOLS
    Bansal, V. K.
    Pal, Mahesh
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2011, 11 (01) : 1 - 18
  • [9] Bergin M., 2011, History of BIM
  • [10] Supporting constructability analysis meetings with Immersive Virtual Reality-based collaborative BIM 4D simulation
    Boton, Conrad
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 96 : 1 - 15