Flow shop scheduling problems with assembly operations: a review and new trends

被引:105
作者
Komaki, G. M. [1 ]
Sheikh, Shaya [2 ]
Malakooti, Behnam [3 ]
机构
[1] Texas A&M Univ Commerce, Coll Business, Dept Mkt & Business Analyt, Commerce, TX USA
[2] New York Inst Technol, Sch Management, Dept Management, New York, NY 10023 USA
[3] Case Western Reserve Univ, Dept Elect Engn & Comp Sci, Syst Engn, Cleveland, OH 44106 USA
关键词
scheduling; flow shop; fabrication; assembly operation; heuristics; TOTAL COMPLETION-TIME; HYBRID GENETIC ALGORITHM; BI-CRITERIA; MATHEMATICAL-MODEL; MINIMIZE MAKESPAN; BOUND ALGORITHM; META-HEURISTICS; OPTIMIZATION ALGORITHM; EXTENSION ALGORITHM; PRODUCTION SYSTEM;
D O I
10.1080/00207543.2018.1550269
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The past few years have witnessed a resurgence of interest in assembly flow shop scheduling as evidenced by increasing number of published articles in this field. A basic assembly flow shop consists of two types of stages: fabrication or machining stage and assembly stage. Machining and assembly stages are composed of either one or a set of machines that are working in parallel. Final products have hierarchical assembly structure with several components and assembly operation(s). The components need to be processed in the machining stage(s) and then assembled based on hierarchical assembly structure. The goal is to find the sequence of jobs that optimises certain objectives. Assembly flow shop scheduling problem has several interesting derivatives and applications in various manufacturing and service industries. This paper provides a consolidated survey of assembly flow shop models with their solution methodology. Finally, the paper concludes by presenting some problems receiving less attention and proposes several salient research opportunities.
引用
收藏
页码:2926 / 2955
页数:30
相关论文
共 163 条
[1]  
Al-Anzi F. S., 2006, International Journal of Operations Research, V3, P109
[2]  
Al-Anzi F.S., 2012, Int. J. Oper. Res. (Taichung), V9, P66
[3]   A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) :80-94
[4]   An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (04) :825-830
[5]   Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) :2682-2689
[6]   A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application [J].
Allahverdi, A ;
Al-Anzi, FS .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) :1056-1080
[7]   The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2) :166-177
[8]   Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) :4713-4735
[9]   Minimizing the number of tardy jobs on a two-stage assembly flowshop [J].
Allahverdi, Ali ;
Aydilek, Asiye ;
Aydilek, Harun .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) :391-403
[10]   Two-stage assembly scheduling problem for minimizing total tardiness with setup times [J].
Allahverdi, Ali ;
Aydilek, Harlin ;
Aydilek, Asiye .
APPLIED MATHEMATICAL MODELLING, 2016, 40 (17-18) :7796-7815