An inexact inventory-theory-based chance-constrained programming model for solid waste management

被引:15
作者
Chen, XiuJuan [1 ]
Huang, GuoHe [1 ]
Suo, MeiQin [2 ]
Zhu, Hua [3 ,4 ]
Dong, Cong [5 ]
机构
[1] Univ Regina, Environm Syst Engn Program, Fac Engn & Appl Sci, Regina, SK S4S 0A2, Canada
[2] Hebei Univ Engn, Sch Urban Construct, Handan 056038, Hebei, Peoples R China
[3] North China Elect Power Univ, SC Energy & Environm Res Acad, Beijing 102206, Peoples R China
[4] Univ Regina, Inst Energy Environm & Sustainable Communities, Regina, SK S4S 0A2, Canada
[5] North China Elect Power Univ, Resources & Environm Res Acad, MOE Key Lab Reg Energy & Environm Syst Optimizat, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Inventory; Uncertainty; Interval; Chance-constrained programming; Waste management; WATER-RESOURCES MANAGEMENT; DUAL UNCERTAINTIES; SYSTEM; DEMAND; PARTS;
D O I
10.1007/s00477-014-0936-x
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, an inexact inventory-theory-based chance-constrained programming (IICP) model is proposed for planning waste management systems. The IICP model is derived through introducing inventory theory model into a general inexact chance-constrained programming framework. It can not only tackle uncertainties presented as both probability distributions and discrete intervals, but also reflect the influence of inventory problem in decision-making problems. The developed method is applied to a case study of long-term municipal solid waste (MSW) management planning. Solutions of total waste allocation, waste allocation batch and waste transferring period associated different risk levels of constraint violation are obtained. The results can be used to identify inventory-based MSW management planning with minimum system cost under various constraint-violation risks. Compared with the ICP model, the developed IICP model can more actually reflect the complexity of MSW management systems and provide more useful information for decision makers.
引用
收藏
页码:1939 / 1955
页数:17
相关论文
共 56 条
[31]   ITCLP: An inexact two-stage chance-constrained program for planning waste management systems [J].
Li, Y. P. ;
Huang, G. H. ;
Nie, S. L. ;
Qin, X. S. .
RESOURCES CONSERVATION AND RECYCLING, 2007, 49 (03) :284-307
[32]   An inexact two-stage mixed integer linear programming method for solid waste management in the City of Regina [J].
Li, Y. P. ;
Huang, G. H. .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2006, 81 (03) :188-209
[33]   Multistage scenario-based interval-stochastic programming for planning water resources allocation [J].
Li, Y. P. ;
Huang, G. H. ;
Chen, X. .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2009, 23 (06) :781-792
[34]   Minimax regret analysis for municipal solid waste management: An interval-stochastic programming approach [J].
Li, Yong P. ;
Huang, Guo H. .
JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 2006, 56 (07) :931-944
[35]  
LINGO, 2011, LIN INT NONL GLOB OP
[36]   DIPIT: Dual Interval Probabilistic Integer Programming for Solid Waste Management [J].
Liu, Z. F. ;
Huang, G. H. ;
Liao, R. F. ;
He, L. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2009, 14 (01) :66-73
[37]   Inventory model with stochastic lead-time and price dependent demand incorporating advance payment [J].
Maiti, A. K. ;
Maiti, M. K. ;
Maiti, M. .
APPLIED MATHEMATICAL MODELLING, 2009, 33 (05) :2433-2443
[38]   A two-stage interval-stochastic programming model for waste management under uncertainty [J].
Maqsood, M ;
Huang, GH .
JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 2003, 53 (05) :540-552
[39]   CHANCE CONSTRAINED PROGRAMMING WITH JOINT CONSTRAINTS [J].
MILLER, BL ;
WAGNER, HM .
OPERATIONS RESEARCH, 1965, 13 (06) :930-&
[40]   An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods [J].
Porras, Eric ;
Dekker, Rommert .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (01) :101-132