Two-sided assembly line balancing considering the relationships between tasks

被引:45
作者
Khorasanian, Danial [1 ]
Hejazi, Seyyed Reza [1 ]
Moslehi, Ghasem [1 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Two-sided assembly line balancing problem; Tasks relationship; Simulated annealing algorithm; GENETIC ALGORITHM; MODEL;
D O I
10.1016/j.cie.2013.08.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Previous studies of the two-sided assembly line balancing problem assumed equal relationships between each two tasks assignable to a side of the line. In practice, however, this relationship may be related to such factors as the distance between the implementation place and the tools required for implementation. We know that the more relationships exist between the tasks assigned to each station, the more efficient will be the assembly line. In this paper, we suggest an index for calculating the value of the relationship between each two tasks, and define a performance criterion called 'assembly line tasks consistency' for calculating the average relationship between the tasks assigned to the stations of each solution. We propose a simulated annealing algorithm for solving the two-sided assembly line balancing problem considering the three performance criteria of number of stations, number of mated-stations, and assembly line tasks consistency. Also, the simulated annealing algorithm is modified for solving the two-sided assembly line balancing problem without considering the relationships between tasks. This modification finds five new best solutions for the number of stations performance criterion and ten new best solutions for the number of mated-stations performance criterion for benchmark instances. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1096 / 1105
页数:10
相关论文
共 24 条
[1]   BALANCING 2-SIDED ASSEMBLY LINES - A CASE-STUDY [J].
BARTHOLDI, JJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2447-2461
[2]   Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems [J].
Baykasoglu, A .
JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (02) :217-232
[3]   Two-sided assembly line balancing using an ant-colony-based heuristic [J].
Baykasoglu, Adil ;
Dereli, Tuerkay .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (5-6) :582-588
[4]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[5]   A classification of assembly line balancing problems [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :674-693
[6]   A survey of the assembly line balancing procedures [J].
Erel, E ;
Sarin, SC .
PRODUCTION PLANNING & CONTROL, 1998, 9 (05) :414-434
[7]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[8]  
Helgeson W.B., 1961, Journal of Industrial Engineering, V12, P394
[9]   A station-oriented enumerative algorithm for two-sided assembly line balancing [J].
Hu, Xiaofeng ;
Wu, Erfei ;
Jin, Ye .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 186 (01) :435-440
[10]   A branch-and-bound algorithm to minimize the line length of a two-sided assembly line [J].
Hu Xiaofeng ;
Wu Erfei ;
Bao Jinsong ;
Jin Ye .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 206 (03) :703-707