A continuity method for bridges constructed with precast prestressed concrete girders

被引:3
作者
Lee, HW
Barnes, RW
Kim, KY
机构
[1] Pukyong Natl Univ, Dept Civil Engn, Pusan 608739, South Korea
[2] Auburn Univ, Dept Civil Engn, Auburn, AL 36849 USA
[3] Pukyong Natl Univ, Dept Civil Engn, Pusan 608739, South Korea
关键词
bridge; continuity method; prestressed concrete; secondary moment; staged prestressing; structural efficiency; U-girder;
D O I
10.12989/sem.2004.17.6.879
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A method of making simply supported girders continuous is described for bridges with spans of 30-45 m. The splicing method takes advantage of an induced secondary moment to transform the self-weight stresses in the precast simply supported girders into values representative of a continuous girder. Them secondary moment results from prestressing of continuity tendons and detensioning of temporary tendons in the girders. Preliminary sections are selected for spliced U-girder bridges with a range of span lengths. Use of the proposed technique results in girder depth reductions of 500-800 mm when compared to standard simply Supported I-girder bridges. The flexural behavior of an example bridge with 40-m spans is examined to illustrate the necessary considerations for determining the optimum sequence of splicing operations.
引用
收藏
页码:879 / 898
页数:20
相关论文
共 15 条
[1]  
ABDEKARIM AM, 1992, STATE OF THE ART PRE
[2]  
*CEB FIP, 1990, MOD COD CONCR STRUCT
[3]  
Girgis A, 2002, PCI J, V47, P138
[4]  
GUYON Y, 1953, PRESTRESSTED CONCRET
[5]  
*KOR HIGHW CORP, 1996, TYP DRAW HIGHW CONST
[6]  
*KOR HIGHW CORP, 1997, DRAW DAEYA BRIDG
[7]  
*KSCE, 1996, HIGHW BRIDG DES SPEC
[8]  
LEE HW, 2000, P EUR C COMP METH AP, P1
[9]  
PIRCHER H, 1996, RM SPACEFRAME REV 5
[10]  
Ralls M.L., 1993, PCI J, V38, P20, DOI [10.15554/pcij.09011993.20.29, DOI 10.15554/PCIJ.09011993.20.29]