Solving a Novel Multiobjective Placement Problem of Recloser and Distributed Generation Sources in Simultaneous Mode by Improved Harmony Search Algorithm

被引:53
作者
Morsali, Roozbeh [1 ]
Ghadimi, Noradin [2 ]
Karimi, Mohammad [3 ]
Mohajeryami, Saeed [4 ]
机构
[1] Univ Mazandaran, Sari, Iran
[2] Islamic Azad Univ, Ardabil Branch, Young Researchers & Elite Club, Ardebil, Iran
[3] Islamic Azad Univ, Parsabad Moghan Branch, Young Researchers & Elite Club, Parsabad Moghan, Iran
[4] Univ North Carolina Charlotte, Energy Prod & Infrastruct Ctr, Dept Elect & Comp Engn, Charlotte, NC USA
关键词
distributed generation placement; recloser placement; harmony search; practical distribution network; PARTICLE SWARM OPTIMIZATION; DISTRIBUTION NETWORKS; SECTIONALIZING SWITCHES; DISTRIBUTION-SYSTEMS; RELIABILITY; ALLOCATION;
D O I
10.1002/cplx.21567
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This article deals with optimal placement of Distributed Generation (DG) sources and recloser in simultaneous mode and develops an improved harmony search (iHS) algorithm to solve it. For this, two important control parameters have been adjusted to reach better solution from simple HS algorithm to obtain better solution from simple HS algorithm. The proposed multiobjective function consists of two parts; first is improving reliability indices and second is minimizing power loss. The reliability indices have been selected based on satisfactory requirements of costumer and electric company as well as response to transient and permanent faults. Then, four reliability indices has been used in objective function; that is, system average interruption duration index (SAIDI), cost of energy not supplied, momentary average interruption frequency index, and system average interruption frequency index (SAIFI). Simulation has been performed on a practical distribution network in North West of Iran. Three scenarios have been introduced; that is, scenario (i) First, placement of DGs, and then recloser, scenario (ii) First, placement of recloser, and then DG, and scenario (iii) simultaneous placement of DG and recloser. Also, three cases are defined based on the number of used DG and recloser. Results of the proposed algorithm have been compared with related values of particle swarm optimization and simple HS algorithms. The core contribution of the presented study is introducing several novel indices to analyze and discuss the obtained results from simulation. (C) 2014 Wiley Periodicals, Inc.
引用
收藏
页码:328 / 339
页数:12
相关论文
共 27 条
[21]   Simultaneous allocation of DGs and remote controllable switches in distribution networks considering multilevel load model [J].
Raoofat, M. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (08) :1429-1436
[22]   Feeder-switch relocation for customer interruption cost minimization [J].
Teng, JH ;
Lu, CN .
IEEE TRANSACTIONS ON POWER DELIVERY, 2002, 17 (01) :254-259
[23]  
Viawan F., 2006, Steady state operation and control of power distribution systems in the presence of distributed generation
[24]   An improved adaptive binary Harmony Search algorithm [J].
Wang, Ling ;
Yang, Ruixin ;
Xu, Yin ;
Niu, Qun ;
Pardalos, Panos M. ;
Fei, Minrui .
INFORMATION SCIENCES, 2013, 232 :58-87
[25]   Reliability-Constrained Optimum Placement of Reclosers and Distributed Generators in Distribution Networks Using an Ant Colony System Algorithm [J].
Wang, Lingfeng ;
Singh, Chanan .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2008, 38 (06) :757-764
[26]   An Improved Harmony Search algorithm for optimal scheduling of the diesel generators in oil rig platforms [J].
Yadav, Parikshit ;
Kumar, Rajesh ;
Panda, S. K. ;
Chang, C. S. .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (02) :893-902
[27]   Optimization of plate-fin heat exchangers by an improved harmony search algorithm [J].
Yousefi, Moslem ;
Enayatifar, Rasul ;
Darus, Amer Nordin ;
Abdullah, Abdul Hanan .
APPLIED THERMAL ENGINEERING, 2013, 50 (01) :877-885