Analysing causal relationships between delay factors in construction projects A case study of Iran

被引:17
作者
Rezaee, Mustafa Jahangoshai [1 ]
Yousefi, Samuel [1 ]
Chakrabortty, Ripon K. [2 ]
机构
[1] Urmia Univ Technol, Fac Ind Engn, Orumiyeh, Iran
[2] UNSW Canberra, Sch IT, ADFA, Campbell, Australia
关键词
Construction projects; Interpretive structural modelling; Causal relationships; Fuzzy data envelopment analysis; Fuzzy cognitive map; Delay factors; FUZZY COGNITIVE MAP; COST OVERRUNS; TIME; SUPPLIER; CRITERIA; INDUSTRY; RANKING; RISKS;
D O I
10.1108/IJMPB-01-2019-0020
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Analyzing factors of delays in construction projects and determining their impact on project performance is necessary to better manage and control projects. Identification of root factors which may lead to project delay and increased cost is vital at the early or planning stage. Better identification of delay factors at the early stage can help the practitioners to reduce their impacts over the long run. Hence, the purpose of this paper is to propose an intelligent method to analyze causal relationships between delay factors in construction projects. The proposed approach is further validated by a real case study of the construction projects in West Azerbaijan province in Iran. Design/methodology/approach During the first phase, the fuzzy cognitive map (FCM) is drawn to indicate the causal relationships between the delay factors and the evaluation factors. For this purpose, the causal relationships between 20 delay factors and four evaluation factors are considered. Afterward, the effect of each factor on management goals is evaluated by using a hybrid learning algorithm. Delay factors are further prioritized by applying fuzzy data envelopment analysis (FDEA). In the second phase, an interpretive structural modeling (ISM) is employed to determine the root causes of delay factors. Findings Results of the first phase show that "supervision technical weaknesses for overcoming technical and executive workshop problems" and "Inaccurate estimation of workload, required equipment and project completion time" are the most significant delay factors. In contrary, "non-use of new engineering contracts" has the lowest impact on the management goals. Meanwhile, the results of the second phase conclude that factors like "Inaccurate estimation of workload, required equipment and project completion time" "weakness of laws and regulations related to job responsibilities" and "lack of foreseen of fines and encouragements in the contracts" are the most significant root factors of delay in construction projects. Originality/value This paper integrates three methods including FCM method, FDEA and ISM. In the first phase, FCM is drawn according to the experts' opinions and concerning management goals and delay factors. Later, these factors are prioritized according to the results of running the algorithm and using the FDEA model. The second phase, the seven-step in the ISM methodology, is done to identify the root factors. To ensure that the root factors of the delay are at a lower level of hierarchical structure, delay factors are partitioned by drawing the ISM model.
引用
收藏
页码:412 / 444
页数:33
相关论文
共 64 条
[11]   Understanding the underlying reasons behind time overruns of government building projects in Ghana [J].
Asiedu, Richard O. ;
Alfen, Hans W. .
KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (06) :2103-2111
[12]  
Atkinson R., 1999, International Journal of Project Management, V17, P337, DOI [10.1016/S0263-7863(98)00069-6, DOI 10.1016/S0263-7863(98)00069-6]
[13]  
Attri R., 2013, Research Journal of Management Sciences, V2, P3
[14]   Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso [J].
Bagaya, Ousseni ;
Song, Jinbo .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (05)
[15]   Assessment of workplace accident risks in underground collieries by integrating a multi-goal cause-and-effect analysis method with MCDM sensitivity analysis [J].
Bakhtavar, Ezzeddin ;
Yousefi, Samuel .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2018, 32 (12) :3317-3332
[16]   Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts [J].
Bhargava, Abhishek ;
Anastasopoulos, Panagiotis Ch. ;
Labi, Samuel ;
Sinha, Kumares C. ;
Mannering, Fred .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (11) :1207-1218
[17]   A simple approach to ranking a group of aggregated fuzzy utilities [J].
Chen, CB ;
Klein, CM .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 1997, 27 (01) :26-35
[18]   Investigating the causes of delay in grain bin construction projects: the case of China [J].
Chen, Gui-Xiang ;
Shan, Ming ;
Chan, Albert P. C. ;
Liu, Xu ;
Zhao, Yi-Qing .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) :1-14
[19]   FCM based hybrid evolutionary computation approach for optimization power consumption by varying cars in EGCS [J].
Chen, Ta-Cheng ;
Lee, An-Chen ;
Huang, Shih-Lun .
APPLIED MATHEMATICAL MODELLING, 2015, 39 (19) :5917-5924
[20]   The analysis of bank business performance and market risk-Applying Fuzzy DEA [J].
Chen, Yu-Chuan ;
Chiu, Yung-Ho ;
Huang, Chin-Wei ;
Tu, Chien Heng .
ECONOMIC MODELLING, 2013, 32 :225-232