A Convergence Criterion for Stochastic Dual Dynamic Programming: Application to the Long-Term Operation Planning Problem

被引:16
作者
Brandi, Rafael Bruno S. [1 ,2 ]
Marques Marcato, Andre Luis [1 ]
Dias, Bruno Henriques [1 ]
Ramos, Tales Pulinho [1 ,2 ]
da Silva Junior, Ivo Chaves [1 ]
机构
[1] Univ Fed Juiz de Fora, Programa Psgrad Engn Eltr, Juiz De Fora, MG, Brazil
[2] Inst Fed Educ Cincia & Tecnol Sudeste Minas Gerai, Brasilia, DF, Brazil
关键词
Long-term operation planning; hydrothermal systems; Stochastic Dual Dynamic Programming (SDDP); risk aversion; convergence criterion; LINEAR DECISION RULE; RESERVOIR MANAGEMENT; RISK-AVERSION; SYSTEM; GENERATION; DESIGN; MODEL;
D O I
10.1109/TPWRS.2017.2787462
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The long-term operation planning problem is generally solved by a chain of computational models based on Stochastic Dual Dynamic Programming (SDDP) considering a period of 5-10 years ahead. A recent issue that has arisen concerning this problem is to define a convergence criterion when using conditional value-at-risk (CVaR) with SDDP due to the lack of good upper bound estimators. The main contribution of this paper is to propose a convergence criterion in which including CVaR does not hinder convergence analysis. Also, the proposed method does not increase the computational burden. Moreover, this paper provides a method that allows forward paths to be individually assessed, which can then either be discarded to reduce computational time or even replaced in an alternative resampling scheme in the SDDP. Based on aggregate reservoir representation, the proposed method of convergence was applied on long-term operation planning problems related to the Brazilian Power System. Results showed improvements in both the SDDP technique and the effectiveness of the proposed convergence criterion when CVaR was used.
引用
收藏
页码:3678 / 3690
页数:13
相关论文
共 26 条
[1]   COMPOSITE REPRESENTATION OF A MULTIRESERVOIR HYDROELECTRIC POWER SYSTEM [J].
ARVANITI.NV ;
ROSING, J .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (02) :319-&
[2]   Improving stochastic dynamic programming on hydrothermal systems through an iterative process [J].
Brandi, Rafael Bruno S. ;
Ramos, Tales Pulinho ;
Dias, Bruno Henriques ;
Marques Marcato, Andre Luis ;
da Silva Junior, Ivo Chaves .
ELECTRIC POWER SYSTEMS RESEARCH, 2015, 123 :147-153
[3]  
CCEE, BRAZ POW SYST DAT FI
[4]   The generation of synthetic inflows via bootstrap to increase the energy efficiency of long-term hydrothermal dispatches [J].
de Castro, Cristina M. B. ;
Marcato, Andre L. M. ;
Souza, Reinaldo Castro ;
Silva Junior, Ivo Chaves ;
Cyrino Oliveira, Fernando Luiz ;
Pulinho, Tales .
ELECTRIC POWER SYSTEMS RESEARCH, 2015, 124 :33-46
[5]   Improving the performance of Stochastic Dual Dynamic Programming [J].
de Matos, Vitor L. ;
Philpott, Andy B. ;
Finardi, Erlon C. .
JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2015, 290 :196-208
[6]   Stochastic Dynamic Programming Applied to Hydrothermal Power Systems Operation Planning Based on the Convex Hull Algorithm [J].
Dias, Bruno H. ;
Marcato, Andre L. M. ;
Souza, Reinaldo C. ;
Soares, Murilo P. ;
Silva, Ivo C., Jr. ;
de Oliveira, Edimar J. ;
Brandi, Rafael B. S. ;
Ramos, Tales P. .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2010, 2010
[7]   Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems [J].
Dias, Bruno Henriques ;
Tomim, Marcelo Aroca ;
Marques Marcato, Andre Luis ;
Ramos, Tales Pulinho ;
Brandi, Rafael Bruno S. ;
da Silva Junior, Ivo Chaves ;
Passos Filho, Joao Alberto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (01) :212-222
[8]   Linear Decision Rules for Hydropower Scheduling Under Uncertainty [J].
Egging, Ruud ;
Fleten, Stein-Erik ;
Gronvik, Ida ;
Hadziomerovic, Ajla ;
Ingvoldstad, Nina .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (01) :103-113
[9]   Sampling strategies and stopping criteria for stochastic dual dynamic programming: A case study in long-term hydrothermal scheduling [J].
Homem-De-Mello T. ;
De Matos V.L. ;
Finardi E.C. .
Energy Systems, 2011, 2 (01) :1-31
[10]   Cut sharing for multistage stochastic linear programs with interstage dependency [J].
Infanger, G ;
Morton, DP .
MATHEMATICAL PROGRAMMING, 1996, 75 (02) :241-256