共 9 条
- [1] An optimal two-processor scheduling for a class of SWITCH-less program nets with combined OR-nodes IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2002, E85A (06): : 1274 - 1280
- [3] Performance evaluation of a two-processor scheduling method for acyclic SWITCH-less program nets IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2005, E88A (06): : 1502 - 1506
- [4] A new proposal to two-processor scheduling problem for SWITCH-less program nets IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2004, E87A (11): : 2859 - 2867
- [5] An optimal parallel algorithm for two-processor scheduling HIGH PERFORMANCE COMPUTING ON THE INFORMATION SUPERHIGHWAY - HPC ASIA '97, PROCEEDINGS, 1997, : 220 - 223
- [7] An effective dynamic priority list for 2-processor scheduling of program nets IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2001, E84A (03): : 755 - 762
- [8] PARAdeg-processor scheduling for acyclic SWITCH-less program nets JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 1999, 336 (07): : 1135 - 1153