Truck Dispatching Optimization Model and Algorithm Based on 0-1 Decision Variables

被引:4
作者
Wang, Zhongxin [1 ,2 ]
Wang, Jinjin [2 ]
Zhao, Ming [2 ]
Guo, Qiang [3 ]
Zeng, Xiangyu [2 ]
Xin, Fengyang [2 ]
Zhou, Hao [2 ]
机构
[1] Liaoning Tech Univ, Sch Min, Fuxin, Peoples R China
[2] CCTEG Shenyang Engn Co, Res & Design Ctr, Shenyang, Peoples R China
[3] CCTEG Shenyang Engn Co, Open Pit Mine Engn Business Unit, Shenyang, Peoples R China
关键词
SYSTEM;
D O I
10.1155/2022/5887672
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study established a truck dispatching model adopting 0-1 decision variables to rationally allocate truck transportation in open-pit mines, maximize the total loading and unloading volume of trucks, and solve the problem of the inability of the truck dispatching model to guide production in open-pit mines because of nonspecific results. The model considers loading and unloading logical relationships, working time constraints, loading and unloading volume constraints, traffic flow constraints, and loading and unloading capacity constraints to maximize the total loading and unloading volume. The operation of trucks between loading and unloading sites is taken as the decision variable. The results show multiple transportation routings of all trucks between loading and unloading sites in working time. Double decision variables are used to solve the expression problem of constraints. The mathematical model is solved using Lingo. The proposed algorithm was then used to optimize the truck dispatching. The application result of the total loading and unloading volume was 10950.6 m(3), and the total loading and unloading number was 384. The optimization result could guide production effectively.
引用
收藏
页数:9
相关论文
共 37 条
  • [1] Alarie S., 2002, INT J SURFACE MINING, V16, P59, DOI [10.1076/ijsm.16.1.59.3408, DOI 10.1076/IJSM.16.1.59.3408]
  • [2] Bao H.M., 2019, COAL TECHNOLOGY, V38, P136, DOI [10.13301/j.cnki.ct.2019.06.047, DOI 10.13301/J.CNKI.CT.2019.06.047]
  • [3] Bastos S.G., 2013, IFAC PROC VOLUMES, V46, P34, DOI [10.3182/20130825-4-US-2038.00090, DOI 10.3182/20130825-4-US-2038.00090]
  • [4] Cetin N, 2004, OPEN PIT TRUCK SHOVE
  • [5] Improving fleet management in mines: The benefit of heterogeneous match factor
    Chaowasakoo, Patarawan
    Seppala, Heikki
    Koivo, Heikki
    Zhou, Quan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 1052 - 1065
  • [6] Coelho V.N., 2012, ELECT NOTES DISCRETE, V39, P233, DOI DOI 10.1016/J.ENDM.2012.10.031
  • [7] Ercelebi SG, 2009, J S AFR I MIN METALL, V109, P433
  • [8] Gao Yu, 2019, FLEXSIM MACHINERY, V46, P58
  • [9] Research on the Evolution Characteristics of Rock Mass Response from Open-Pit to Underground Mining
    Geng, Jiabo
    Li, Qihang
    Li, Xiaoshuang
    Zhou, Tao
    Liu, Zhifang
    Xie, Yulin
    [J]. ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2021, 2021
  • [10] Geng W, 2017, GUANGDONG CHEM IND, V44, P319