共 8 条
[1]
Cwikla G., 2012, INNOWACJE ZARZADZANI, VI, P780
[2]
Dzitkowski T, 2012, J VIBROENG, V14, P528
[3]
Grabowik C, 2012, LECT NOTES COMPUT SC, V7209, P284
[4]
Grabowik C, 2011, LECT NOTES ARTIF INT, V6679, P405, DOI 10.1007/978-3-642-21222-2_49
[5]
Predictive - reactive strategy for real time scheduling of manufacturing systems
[J].
MECHATRONICS AND COMPUTATIONAL MECHANICS,
2013, 307
:470-473
[6]
Krenczyk D, 2012, LECT NOTES COMPUT SC, V7209, P274
[7]
Robust Scheduling, a Production Scheduling Model of Failures
[J].
MECHATRONICS AND COMPUTATIONAL MECHANICS,
2013, 307
:443-446
[8]
Swider J, 2012, J VIBROENG, V14, P117